TOCII CA72TOC
Maintenance
Hauser
103
7.9.5
Opening the circuit
This section describes how the dosing head (capillary) is cleaned or replaced.
The furnace temperature is not reduced. The system continues to perform sample conditioning
(stripping).
a0012498
Fig. 57:
Position of the dosing unit
You require the following parts:
• Damp cloth
a0012492
Fig. 58:
Dosing
1
Red screw plug
2
Dosing head with needle
3
O-ring
4
O-ring
5
Dosing head
1
2
3
4
5
Summary of Contents for TOCII CA72TOC
Page 2: ...Endress Hauser...
Page 136: ...TOCII CA72TOC 136 Endress Hauser...
Page 139: ......
Page 140: ......