Asset Health Monitoring Solution
Operating Manual
22
Hauser Digital Solutions
5
Maintaining the Project
5.1
Add a device to the project
1.
Connect to SRP700 Gateway either via Remote Desktop or local access.
2.
Navigate to the module where the new device is connected to and click “Verify network” in the
context menu.
3.
Assign any newly found device(s) to the Plant Topology by drag & drop
4.
Save the project
5.
Stop Condition Monitoring
•
Open the FieldCare Guardian from the tray, select Condition Monitoring and press the Stop
button.
6.
Restart Condition Monitoring
The new device(s) is/are added to the project