background image

Activating the battery on connection B2

2

E Hauser

Safety instructions

• The measuring device is energized. Danger: Risk of electric shock! 

Open the measuring device in a de-energized state only.

• Before removing the device: set the  process in a safe condition and 

purge the pipe of dangerous materials.

• Hot surfaces! Risk of injury! Before commencing work, allow the 

system and measuring device to cool down to a touchable 
temperature.

• In the case of measuring devices in custody transfer, the custody 

transfer status no longer applies once the lead seal has been removed.

• Comply with national regulations governing mounting, electrical 

installation, commissioning, maintenance and repair procedures.

• Requirements with regard to specialized technical staff for the 

mounting, electrical installation, commissioning, maintenance and 
repair of the measuring devices: 
– trained in instrument safety
– familiar with the individual operation conditions of the devices
– for Ex-certified measuring devices: also trained in explosion 

protection

• Follow the Operating Instructions for the device.
• Risk of damaging electronic components! Ensure you have a working 

environment protected from electrostatic discharge. 

• After removing the electronics cover, there is a risk of electric shock 

as shock protection is removed! 

Switch off the measuring device before removing internal covers.

• Modifications to the measuring device are not permitted.

• In the case of measuring devices in safety-related applications in 

accordance with IEC 61508 or IEC 61511: After repair recommission 
in accordance with Operating Instructions. Document the repair 
procedure.

• Only open housing for a brief period. Avoid the penetration of foreign 

bodies,  moisture or contaminants.

• Replace defective seal/gaskets with genuine parts from 

Hauser only.

• If threads are damaged or defective, the measuring device must be 

repaired.

• Threads (e.g. of the cover for the electronics and connection 

compartments) must be lubricated. Use an acid-free, non-hardening 
grease if an abrasion resistant dry lubricant is non-existent.

• If spacing is reduced or the dielectric strength of the measuring device 

cannot be guaranteed during repair work, perform a test on 
completion of the work 

(e.g. high-voltage test in accordance with the manufacturer's 
instructions).

• Service connector: 

– do not connect in potentially explosive atmospheres.
– only connect to Hauser service devices.

• Observe the instructions for transporting and returning the device 

outlined in the Operating Instructions.

• If you have any questions, contact your E+H service organization.

Tool List

A  Activating the battery

• This instruction describes how to activate the battery on the B2 connection.

• For your information: B1 and B3 (optional) have been activated by the manufactuerer and require no consideration.

• For your information: The configuration 4 + 6 doesn‘t contain a battery on the B2 connection and require no consideration. 

It is listed for your information only.

• Attention if someone enables B2 and then he doesn't connect the battery, the board may shut off unexpectedly and it will not work.

• First, connect the batteries in accordance with operating instructions.

• Next, affix the connection label (1) as indicated in the graphic below.

• Afterwards activate the battery on the B2 connection according to this Instructon. 

B2 can be activated via Display or via Configuration Software Config 5800 in the internal data menu with the command BT2HE. 

In both cases the numerical value has to be set 1.

• How to arrange the batteries see chapter B - chapter G. 

Check the order code on your packaging note, DK5004-1 e. g. and choose the appropriate configuration.

 PH2

1

A0017949

1

Summary of Contents for Promag 800 L

Page 1: ...Ah 2 battery pack 3 6V 19 Ah 1 label battery configuration for 2 batteries on page 3 chapter B DK5004 4 Kit battery 19Ah 1 battery pack 3 6V 19Ah 1 label battery configuration for 1 battery on page 3 chapter E DK5004 2 Kit battery 19Ah 57 Ah 1 battery pack 3 6V 19Ah 1 batterie pack 3 6V 57Ah 1 label battery configuration for 4 batteries on page 3 chapter C DK5004 5 Kit battery 19Ah 38Ah 57Ah 1 bat...

Page 2: ...ace defective seal gaskets with genuine parts from Endress Hauser only If threads are damaged or defective the measuring device must be repaired Threads e g of the cover for the electronics and connection compartments must be lubricated Use an acid free non hardening grease if an abrasion resistant dry lubricant is non existent If spacing is reduced or the dielectric strength of the measuring devi...

Page 3: ...s Connectors Number of batteries Battery usage A0017129 B1 1 Backup power supply for the measuring device B1 has been switched on by the manufacturer and needn t to be considered B2 3 Power supply for the measuring device B3 Power supply for the GSM GPRS modem B2 B1 B1 B2 B3 B1 B1 B2 B3 B2 B1 B2 B3 B2 B1 1 Where to find B2 on the display and to set the numeric value on position 1 2 Go back into th...

Page 4: ... set the numeric value on position 1 2 To go back into the nominal range press the ESC button 2 times for 2 seconds 3 Then check the B2 state of charge of the battery in accordance with the graphic below 11 INTERNAL DATA L2 code Load fact data A0019499 Save fact data Memory reset B2 1 KF 1 00000 KF 1 0053 Configuration of batteries Connectors Number of batteries Battery usage A0017132 B1 1 Backup ...

Page 5: ...ätekomponente Siehe DK5004 1 Batterieset 19Ah 2 Batterie Pack 3 6V 19 Ah 1 Schild Batteriebelegung für 2 Batterien Seite 3 Kap B DK5004 4 Batterieset 19Ah 1 Batterie Pack 3 6V 19Ah 1 Schild Batteriebelegung für 1 Batterie Seite 3 Kap E DK5004 2 Batterieset 19Ah 57 Ah 1 Batterie Pack 3 6V 19Ah 1 Batterie Pack 3 6V 57Ah 1 Schild Batteriebelegung für 4 Batterien Seite 3 Kap C DK5004 5 Batterieset 19A...

Page 6: ... des Messgeräts Gewinde z B von Elektronikraum und Anschlussraumdeckel müssen geschmiert sein Säurefreies nicht härtendes Fett verwenden sofern keine abriebfeste Trockenschmierung vorhanden ist Wenn bei den Reparaturarbeiten Abstände reduziert oder die Spannungsfestigkeit des Messgeräts nicht sichergestellt werden kann Prüfung nach Abschluss der Arbeiten durchführen z B Hochspannungstest gemäß Her...

Page 7: ...tterien Anschlussstecker Anzahl Batterie Verwendung der Batterie n A0017129 B1 1 Sicherung der Versorgung des Messgerätes Back up B1 ist bereits vom Herstellerwerk aus eingeschaltet und muss nicht berücksichtigt werden B2 3 Versorgung des Messgerätes B3 Versorgung GSM GPRS Modems B2 B1 B1 B2 B3 B1 B1 B2 B3 B2 B1 B2 B3 B2 B1 1 Menupunkt B2 im Display aufsuchen und Zahlenwert auf 1 setzen 2 Zurück i...

Page 8: ...uchen und Zahlenwert auf 1 setzen 2 Zurück in den Anzeigebereich gehen dazu die ESC Taste 2 mal 2 Sekunden drücken 3 Anschliessend B2 Batterieladezustand gemäss nachfolgender Abbildung kontrollieren 11 INTERNAL DATA L2 code Load fact data A0019499 Save fact data Memory reset B2 1 KF 1 00000 KF 1 0053 Konfiguration Batterien Anschlussstecker Anzahl Batterie Verwendung der Batterie n A0017132 B1 1 S...

Reviews: