Proline Promass F 200 HART
Commissioning
Hauser
51
10
Commissioning
10.1
Function check
Before commissioning the device, make sure that the post-installation and post-connection checks
have been performed.
• "Post-mounting check" checklist (
• "Post-connection check" checklist (
10.2
Switching on the measuring device
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup display to the
operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the section
on "Diagnostics and troubleshooting" (
10.3
Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Display/operat.
Setup
Main menu
0104-1
Language
English
Español
Français
Language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Language
English
Deutsch
0104-1
Anzeige/Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
mA
A0013996
å
9
Illustrated using the example of the local display
10.4
Configuring the measuring device
The
Setup
menu with its guided wizards contains all parameters needed for standard operation.
Navigation to the "Setup" menu