Commissioning
Proline 200 PROFIBUS PA
28
Hauser
8
Commissioning
8.1
Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 11
• "Post-connection check" checklist → 21
8.2
Switching on the measuring device
‣
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the
Operating Instructions for the device → 2
8.3
Setting the operating language
Factory setting: English or ordered local language
Summary of Contents for Proline 200 PROFIBUS PA
Page 32: ...www addresses endress com...