Liquiline System CA80AL
Commissioning
Hauser
51
2
3
4
RB
RK
C
S1
P
W1
Cu
M
D
D5
D6
D7
5
RN
7
C
S1
RK
RB
RN
P
1
W2
2
optional
dilution
A0033652
69
Liquiline System CA80AL, self-priming
RN
Reagent RN
M
Photometer/measuring cell
C
Cleaner
Cu
Cuvette
S1
Standard 1
P
Sample
RK
Reagent RK
2, 3, 4, 5,
7
Dispensers
RB
Reagent RB
D
Outlet
W1
Outlet
1
T-piece
9.1.2
Connecting the sample inlet hose
1. Ensure a constant and sufficient supply of sample at the installation location.
2. Connect the liquid-bearing hoses of the sample supply system.
3. Self-priming system: connect the intake hose supplied (1.5 m (4.92 ft)) to the Liquid
Manager ("sample") (→ 49) and guide it through the hose gland of the analyzer to
the outside.
4. If present, connect the communication cable and hose heater of the sample
preparation system to the analyzer.
5. Ensure that only sample that has a low solids content is supplied, as otherwise there
is a risk of blockage.
9.2
Function check
L
WARNING
Incorrect connection, incorrect supply voltage
Safety risks for staff and device malfunctions!
‣
Check that all connections have been established correctly in accordance with the
wiring diagram.
‣
Ensure that the supply voltage matches the voltage indicated on the nameplate.
Before putting the device into operation:
1. Connect the liquid-bearing hoses of the sample supply system.
2. If present, connect the communication cable and hose heater of the sample
preparation system to the analyzer.
3. After mounting:
Check all connections to ensure they are secure and leak-tight.
Summary of Contents for Liquiline System CA80AL
Page 2: ......
Page 117: ...Liquiline System CA80AL Operation Endress Hauser 117 5 Connect the valve or pump ...
Page 175: ......
Page 176: ...www addresses endress com ...