background image

Commissioning

Levelflex FMP50 HART

32

Hauser

8.3  

Device configuration

8.3.1  

Configuring level measurement

F

L

D

E

20 mA

100%

4 mA

0%

LN

R

  A0011360

 19

Configuration parameters for level measurement in liquids

LN = Probe length

R = Reference point of measurement

D = Distance

E = Empty calibration (= zero point)

L = Level

F = Full calibration (= span)

1.

Setup → Device tag

 Enter device tag.

2.

Setup → Distance unit

 Select the length unit.

3.

Setup → Tank type

 Select tank type.

4.

Setup → Tube diameter

 (only for "Tank type" = "Bypass / pipe")

 Specify the diameter of the bypass or stilling well.

5.

Setup → Medium group

 Specify the medium group (

Others

 or 

Water based (DC >= 4)

)

6.

Setup → Empty calibration

 Specify the empty distance E (distance from the reference point R to the 0% mark).

Summary of Contents for Levelflex FMP50

Page 1: ...titute for the Operating Instructions pertaining to the device Detailed information about the device can be found in the Operating Instructions and the additional documentation Available for all devic...

Page 2: ...er no www endress com deviceviewer Endress Hauser Operations App XXXXXXXXXXXX XXXXX XXXXXX XXX XXXX XX Serial number 1 3 2 A0023555 2 About this document 2 1 Symbols 2 1 1 Safety symbols DANGER This s...

Page 3: ...must be connected to ground prior to establishing any other connections The ground terminals are located on the inside and outside of the device Inner ground terminal protective earth is connected to...

Page 4: ...ed by the plant owner operator Are familiar with federal national regulations Must have read and understood the instructions in the manual and supplementary documentation Follow instructions and compl...

Page 5: ...may rise up to 80 C 176 F When in operation the sensor may reach a temperature close to the medium temperature Danger of burns from contact with surfaces In the event of high medium temperatures ensu...

Page 6: ...on the nameplate is no longer valid This may also impair the safe operation of the device 3 5 1 CE mark The measuring system meets the legal requirements of the applicable EU directives These are lis...

Page 7: ...nformation on the measuring device and on the scope of the technical documentation pertaining to the device is displayed 4 3 Storage and transport 4 3 1 Storage temperature Permitted storage temperatu...

Page 8: ...Mounting Levelflex FMP50 HART 8 Endress Hauser 5 Mounting 5 1 Mounting requirements 5 1 1 Suitable mounting position A C 1 2 3 4 B A0012606 1 Installation conditions for Levelflex...

Page 9: ...istance B between rod probes and internal fittings 3 300 mm 12 in When using more than one Levelflex Minimum distance between the sensor axes 100 mm 3 94 in Distance C from the end of the probe to the...

Page 10: ...ly grounded or reliably insulated Use an insulated fastening kit if it is not otherwise possible to secure the probe with a reliably insulated connection Securing rod probes In the case of WHG approva...

Page 11: ...ing devices with a threaded connection A0012528 Screw the device with the threaded connection into a sleeve or flange and then secure it to the process vessel via the sleeve flange When screwing into...

Page 12: ...l Uncoil the rope slowly and lower it carefully into the vessel Make sure the rope does not bend or buckle Avoid uncontrolled swinging of the weight as this could damage internal fittings in the vesse...

Page 13: ...g an Allen key 3 mm and turn the clamp 90 counterclockwise 2 Unscrew the electronics compartment cover and check the cover seal replace it if necessary Turning the display module 1 2 A0036401 1 Pull o...

Page 14: ...s compartment cover with 2 5 Nm 6 Electrical connection 6 1 Connecting requirements 6 1 1 Terminal assignment Terminal assignment 2 wire 4 to 20 mA HART 1 2 A 1 2 B 1 2 3 3 A0036498 2 Terminal assignm...

Page 15: ...uring device Terminal assignment 2 wire 4 to 20 mA HART switch output A 1 2 3 4 B 1 2 3 4 1 3 5 5 2 4 A0036500 4 Terminal assignment 2 wire 4 to 20 mA HART switch output A Without integrated overvolta...

Page 16: ...e 7 Switch output open collector Terminal assignment 2 wire 4 to 20 mA HART 4 to 20 mA A 1 2 3 4 B 1 2 3 4 1 3 5 5 2 4 A0036500 6 Terminal assignment 2 wire 4 to 20 mA HART 4 to 20 mA A Without integr...

Page 17: ...A195 or FieldXpert SFX350 SFX370 via VIATOR Bluetooth modem 4 Analog display unit observe maximum load 5 Cable screen observe cable specification 6 Measuring device 7 Analog display unit observe maxim...

Page 18: ...ubox FXA195 or FieldXpert SFX350 SFX370 via VIATOR Bluetooth modem 4 Analog display unit observe maximum load 5 Cable screen observe cable specification 6 Measuring device 7 Supply voltage observe ter...

Page 19: ...e or threaded connection or to the external ground terminal An easily accessible power switch must be installed in the proximity of the device The power switch must be marked as a disconnector for the...

Page 20: ...Levelflex FMP50 HART 20 Endress Hauser 2 1 3 4 A0011175 12 Pin assignment of M12 plug 1 Signal 2 Not assigned 3 Signal 4 Ground 4 2 3 1 A0011176 13 Pin assignment of 7 8 plug 1 Signal 2 Signal 3 Not...

Page 21: ...A 2 Feature 010 in the product structure 3 At ambient temperatures Ta 30 C a terminal voltage U 14 V is required to start the device with the minimum failure current 3 6 mA At ambient temperatures Ta...

Page 22: ...ic Ex ic ia Ex d ia XP Ex ta DIP CSA GP 13 5 to 35 V 3 4 R V U0 10 13 5 24 5 20 30 0 500 35 A0034971 Ex ia IS Ex ia Ex d ia IS XP 13 5 to 30 V 3 4 1 Feature 020 of the product structure option B 2 Fe...

Page 23: ...Feature 020 of the product structure option C 2 Feature 010 in the product structure 3 At ambient temperatures Ta 30 C a terminal voltage U 16 V is required to start the device with the minimum failur...

Page 24: ...Instructions XA Use specified cable glands only Check to ensure that the power supply matches the information on the nameplate Switch off the power supply before connecting the device Connect the pot...

Page 25: ...cables also fit ferrules 4 Firmly tighten the cable glands 5 Connect the cable according to the terminal assignment 2 1 4 3 2 1 4 3 A0034682 6 If using shielded cables Connect the cable shield to the...

Page 26: ...osing the cover of the connection compartment 1 2 2 5 Nm 3 mm A0021491 1 Screw down the cover of the connection compartment 2 Turn the securing clamp 90 in the clockwise direction and using an Allen k...

Page 27: ...ol if an error is active 1 2 Measured value symbols 1 3 Measured value 1 4 Unit 2 Measured value display bar graph 1 value 2 1 Bar graph for measured value 1 2 2 Measured value 1 including unit 2 3 Me...

Page 28: ...lay module 1 Operating keys Key assignment Key Navigate down in the picklist Edit the numerical values or characters within a function Key Navigate up in the picklist Edit the numerical values or char...

Page 29: ...should generally be completely configured Setup Mapping Mapping of interference echos Setup Advanced setup Contains additional submenus and parameters For more customized configuration of the measurem...

Page 30: ...l display appears Calling up the menu via the context menu 1 Open the context menu 2 Press to navigate to the desired menu 3 Press to confirm the selection The selected menu opens 8 Commissioning 8 1...

Page 31: ...ion Setup Main menu 0104 1 Display language English Espa ol Fran ais Display language English Deutsch 0104 1 Espa ol Fran ais Display language English Deutsch 0104 1 Betrieb Setup Hauptmen Sprache Deu...

Page 32: ...ance E Empty calibration zero point L Level F Full calibration span 1 Setup Device tag Enter device tag 2 Setup Distance unit Select the length unit 3 Setup Tank type Select tank type 4 Setup Tube dia...

Page 33: ...level L for verification purposes 9 Setup Distance Displays the distance D between the reference point R and the level L for verification purposes 10 Setup Signal quality Displays the signal quality o...

Page 34: ......

Page 35: ......

Page 36: ...www addresses endress com 71567028 71567028...

Reviews: