Installation
Proline Promag 51
28
Hauser
3.4
Post-installation check
Perform the following checks after installing the measuring device in the pipe:
Device condition and specifications
Notes
Is the device damaged (visual inspection)?
-
Does the device correspond to specifications at the measuring point, including
process temperature and pressure, ambient temperature, minimum fluid
conductivity, measuring range, etc.?
Installation
Notes
Does the arrow on the sensor nameplate match the direction of flow through the
pipe?
-
Is the plane of the measuring electrode axis correct?
Horizontal?
Is the position of the Empty Pipe Detection (EPD) electrode correct?
Were all threaded fasteners tightened to the specified torques when the sensor was
installed?
Promag W
Were the correct seals installed (type, material, installation)?
Promag W
Are the measuring point number and labeling correct (visual inspection)?
-
Have all the lead seals (lead seal diagram) and protection stickers been fitted?
Process environment / process conditions
Notes
Are the inlet and outlet runs to respected?
Inlet run
5 × DN
Outlet run
2 × DN
Is the measuring device protected against moisture and direct sunlight?
-
Is the sensor adequately protected against vibration (attachment, support)?
Acceleration up to 2 g by
analogy with IEC 600 68-2-8