3 Installation
CleanFit P CPA 471
12
Hauser
Gel electrode
1. Pull lifting tube fully into assembly
(in »Maintenance« position,
see Fig. 3.8).
2. Turn stop bolt lock through 90° so that
plastic grooves are located above the
recesses.
3. Turn lifting tube clockwise until stop
bolt lock engages.
4. Remove splash protection cap from
assembly.
5. Now remove lifting tube by turning
anticlockwise.
6. Insert electrode hand-tight in
electrode holder that is now visible
and tighten by ¼ turn using socket
spanner (WAF17).
7. Insert measuring cable from top
through handle and lifting tube.
8. Screw measuring cable on electrode
plug-in head and tighten hand-tight.
9. Screw lifting tube hand-tight back on
assembly.
10.Place measuring cable in splash
protection tube and insert on
protective tube.
11.Push PM connector on PM connection
(PM = Potential Matching Line).
12.Release stop bolt lock catch: Remove
stop bolt lock and turn through 90°.
Remove electrode in the reverse
sequence of operations.
Fig. 3.9:
top:Turn stop bolt lock through 90° so
that plastic grooves are located above
recesses.
bottom:When turning lifting tube, stop
bolt lock engages.
Fig. 3.10: PM connector on
CPS 11/12