CA76NA
Mounting
Hauser
15
5
Mounting
L
CAUTION
Danger of crushing or entrapment if the analyzer is mounted or disassembled
incorrectly
‣
Two people are needed to mount and disassemble the analyzer.
‣
Wear suitable protective gloves to protect against mechanical risks.
‣
Comply with minimum spacing requirements when mounting.
‣
Use the spacers provided when mounting.
5.1
Mounting requirements
5.1.1
Mounting options
Mounted on a vertical surface:
• Wall
• Mounting plate
5.1.2
Dimensions
The mounting materials required to secure the device to the wall (screws, wall plugs) are
not supplied.
‣
Provide mounting materials on site.