
22
RECOMMENDED
MAINTENANCE
SCHEDULE(S)
Maintenance Service Interval
Maintenance Procedure
Before each use or daily
Check the engine oil level
Check the mower blades
Check the safety interlock system
Check for loose hardware
Check for belt obstructions
Check for fuel and oil leakage
Clean the engine and exhaust system area
Clean the grass and debris build-up from the machine and
cutting deck, including under the deck
After the first 8 hours
Change the engine oil
After the first 100 hours
Check the wheel hub torque
Torque the wheel lug nuts
Clean dust and dirt from cylinder and cylinder head fins
Change engine oil
Clean and regap spark plugs
After the first 250 hours
Change the hydraulic filter and replace the fluid in the
reservoir
Every 40 hours
Check the hydraulic oil level
Check the condition of the belts
Check the tire pressures
Lubricate the caster wheel bearings
Every 100 hours
Change the engine oil.
Every 200 hours
Grease the lift linkage pivots
Change engine oil filter
Every 250 hours
Replace the primary air cleaner
Check secondary air cleaner
– replace if dirty. See the
Engine manual for additional information
Every 500 hours
Change the hydraulic filter and fluid (Synthetic 15W50)
Check the wheel hub torque
Torque the wheel lug nuts
Replace the secondary air cleaner. See the engine manual
for additional information.
Monthly
Check the battery charge
Yearly
Grease the front caster pivots
Summary of Contents for Rage ER52FX730V
Page 1: ...ER52FX730V ER52FX730VCA OPERATORS MANUAL...
Page 33: ...33 WIRING SCHEMATICS...
Page 34: ...34 HYDRAULIC SCHEMATIC...