background image

Doc. No: 01999954 

Revision: A 

 

1 of 3 

Issue Date: 08/15/21 

INSTALLATION 

 OPERATION 

 MAINTENANCE MANUAL 

ASSEMBLY INSTRUCTIONS/TESTING 

PROCEDURES FOR STU2 

PARTS LIST 

Qty 

Description 

Four Wheel Castered Dolly (Item #1) 

Receptacle (Item #2) 

Drain Assembly (Item #3) 

Shower Tester (Not shown) 

Eyewash Tester (Not shown) 

Inspection Tags (Not shown) 

SHOWER TESTING UNIT 2 (STU2) ASSEMBLY INSTRUCTIONS 

1.  Attach the drain assembly (item #3) to the receptacle (item #2). Remove the flange nut and one gasket from the 

bulkhead of the drain assembly. Insert the bulkhead/drain assembly into the hole located in the bottom of the 
receptacle with the drain valve to the outside. From the inside of the receptacle, attach the gasket and the flange 
nut. Proper installation requires one gasket on the inside and one on the outside of the wall of the receptacle. The 
valve should be positioned with the handle to the top. Tighten the bulkhead assembly to prevent leakage. 

2.  Attach the four-wheel castered dolly (item #1) to the receptacle. The dolly attaches with a twist on motion. Set the 

receptacle on the dolly, and twist the receptacle in a clockwise motion. The dolly will lock to the receptacle. To 
remove the dolly, reverse the procedure. See the assembly view on page 2. 

SHOWER TESTING UNIT 1 TESTING INSTRUCTIONS 

1.  Secure large end of test chute with drawstring around showerhead. 
2.  Position the mobile receptacle cart under the shower and place the narrow end of the test chute inside of 

receptacle. 

3.  Activate shower.  

20 GPM REGULATED SHOWERHEAD 

1.  Time activation for 30 seconds. 
2.  The first molded line of the receptacle represents a volume of approximately 11 gallons. Water level should be at or 

slightly below this line of the receptacle. This ensures the shower head is providing the minimum 20 gallon per 
minute (GPM) as required by ANSI Z358.1 1998.  

Note:

 The second molded line of the receptacle represents a volume of approximately 21 gallons. You may allow 

the shower to run for one minute and the water level should be at or slightly below this line. 

3.  Empty receptacle by opening the drain valve.  

Note:

 The receptacle will retain approximately one gallon of water. Be sure to empty remaining water or take into 

account on subsequent tests. 

4.  Record testing results on inspection tag. 

30 GPM REGULATED SHOWERHEAD 

1.  Time activation for 20 seconds. 
2.  The first molded line of the receptacle represents a volume of approximately 11 gallons. Water level should be at or 

slightly below this line of the receptacle. This ensures the shower head is providing 30 gallon per minute (GPM) as 
required by ANSI Z358.1 1998.  

Note:

 The second molded line of the receptacle represents a volume of approximately 21 gallons. You may allow 

the shower to run for 40 seconds and the water level should be at or slightly below this line. 

3.  Empty receptacle by opening the drain valve.  

Note:

 The receptacle will retain approximately one gallon of water. Be sure to empty remaining water or take into 

account on subsequent tests. 

4.  Record testing results on inspection tag. 

 

Reviews: