Enardo EPRV User Manual Download Page 5

6300089                                                                                  5            

EPRV-C.DOC 8/23/2013 

 

Vent  Operation

 

 
 

Both the Enardo EPRV and EPRV-V maintain a tight seal until system pressure, or 
vacuum, exceeds the set pressure of the vent.  To adjust the set pressure, a series of 
weights may be stacked onto the lid assembly.  When over-pressure occurs the weighted 
lid assembly lifts, breaking the seal between the seat and seal portion of the lid assembly.  
This allows vapors to pass through the vent orifice and relieve pressure build up.  The 
vent reseals upon relief and remains sealed. 
 
It is important to know that relieving vapors near the set pressure in a continuous manner 
may cause the lid assembly to flutter, or oscillate.  This is a common occurrence in 
products of this type in the industry.  Operating the vent with flutter, or oscillation, over 
time may cause premature vent damage or wear.  Feel free to contact Enardo with any 
questions. 

 

Pressure Flow

 

Vacuum Flow

 

Summary of Contents for EPRV

Page 1: ...Enardo Emergency Pressure Relief Vent EPRV and Emergency Pressure Relief Vent with Vacuum EPRV V User s Manual EPRV EPRV V Enardo 4470 S 70th E Ave Tulsa OK USA 74145 4607...

Page 2: ...Vent EPRV and Emergency Pressure Relief Vent with Vacuum EPRV V User s Manual Contents Product Line 3 Vent Configurations 4 Vent Operation 5 Vent Installation 6 Vent Maintenance 7 Pressure and Vacuum...

Page 3: ...tinued sealing performance that exceed the most stringent industry standards 1 scfh 90 set point per valve Below is a list of emergency relief vent that Enardo offers Emergency Pressure Relief Pressur...

Page 4: ...6300089 4 EPRV C DOC 8 23 2013 Vent Configurations Emergency Pressure Relief Vent EPRV Emergency Pressure Relief Vent with Vacuum EPRV V...

Page 5: ...nd seal portion of the lid assembly This allows vapors to pass through the vent orifice and relieve pressure build up The vent reseals upon relief and remains sealed It is important to know that relie...

Page 6: ...r the vent into place 4 Insert the appropriate number of bolts and make sure the vent is fastened securely Installed bolts should be clear of the lid assembly when it is in the full open position 5 In...

Page 7: ...6300089 7 EPRV C DOC 8 23 2013...

Page 8: ...just the height of the installed spring Cleaning of internal components should be done with a suitable solvent and nonabrasive cloth 3 Replace the spring chamber and hood Fasten securely 4 On the outs...

Page 9: ...ed These elevated settings are preset at the factory Vacuum settings for the EPRV V are set with a spring For each setting that Enardo offers there is a spring that is specifically designed to do the...

Page 10: ...on the product nameplate Remove the exiting weigh set These weights will not be used for the new setting but the fasteners and roll pin may be retained for use in the new installation if necessary Ins...

Page 11: ...services The rights and remedies of buyer hereunder i Are exclusive and in substitution for and buyer hereby waives all other warranties guaranties obligations liabilities rights and remedies express...

Reviews: