Zoë-CM2
Installation Procedure
Installation
1.
Run the Gas and Vacuum Supply Line through the incubator access hole.
2.
Plug the Power Supply into an APC UPS or grounded wall outlet, mount the Power Supply transformer
to the back of the incubator, and run the Power Cord through the incubator access hole.
Caution:
Ensure the 24V Power Supply and Cord that came with Zoë-CM2 are being used. Do
not use a Zoë-CM1 Power Supply since these output 12V and will not work with Zoë-CM2.
3.
Connect the Ethernet Cable to an active network port and run it through the incubator access hole.
4.
Connect the Gas and Vacuum Supply Line, Power Cord, and Ethernet Cable to the Zoë Bulkhead.
5.
Connect the Gas Supply Line to the gas hub and connect the Vacuum Supply Line to the vacuum hub.
6.
Power on Zoë-CM2 by pushing the Power Button on the front of the unit.
Note:
The Power Cord may disconnect from the module during installation. It may also disconnect if
the module or incubator is moved. It is recommended to minimize any tension/strain on the
Power Cord. A magnet is provided to help minimize cable tension in the back of the incubator.
Zoë-CM2 Culture Module / Installation
Summary of Contents for Zoe-CM2
Page 1: ...Zo CM2TM User Guide...
Page 2: ......
Page 6: ......
Page 12: ......
Page 16: ......
Page 20: ......
Page 28: ......
Page 44: ......
Page 45: ...Page 45 Settings Page 45 6...
Page 48: ......
Page 49: ...Page 49 Updating Firmware Downloading Logs Page 49 7...
Page 52: ......
Page 54: ......
Page 55: ...Page 55 Care Page 55 9...