background image

REFERENCE

26 

EMPYRE ELITE XT INSTALLATION AND OPERATION MANUAL

Model 100

914.5

36.00

1569.9

61.81

335.2

13.20

852.5

33.56

1484.5

58.45

Elite 100 Unit Dimensions

3

1

4

1

2

Not shown



 



























0















LB



APP.

817753







Empyre Elite Assembly

817753

817753







































Revisions

DESCRIPTION

ECO





 BY

06/07/11

Production Release

2535

M/D/Y

REV

Figure 2 - Brick Layout

Figure 3 - Refractory Layout

Figure 1 - Unit Dimensions

3

1

4

1

2

Not shown



 



























0















LB



APP.

817753







Empyre Elite Assembly

817753

817753







































Revisions

DESCRIPTION

ECO





 BY

06/07/11

Production Release

2535

M/D/Y

REV

3

1

4

1

2

Not shown



 



























0















LB



APP.

817753







Empyre Elite Assembly

817753

817753







































Revisions

DESCRIPTION

ECO





 BY

06/07/11

Production Release

2535

M/D/Y

REV

Summary of Contents for Elite XT 100

Page 1: ...Installation and Operation Instructions Empyre Elite XT Model 100 and 200...

Page 2: ......

Page 3: ...Foundation Dimensions 11 Trench for Underground Pipes 11 Outdoor Furnace Installation 12 Outdoor Chimney Installation 12 Indoor Chimney Installation 12 Supplying Make Up Air 12 Low Water Temperature P...

Page 4: ...Heating Season 21 Reference 22 27 Operating the Digital Temperature Switch DTS 22 Hot Water Wood Furnace Wiring Diagram 23 How to Correct a Sticking Flapper 24 Furnace Specifications 25 Unit Dimensio...

Page 5: ...e Empyre Elite XT Works The Empyre Elite XT uses a process called wood gasification to produce highly efficient combustion in the furnace s dual burn chambers 1 Wood in the firebox burns from the bott...

Page 6: ..._________ Serial No _______________________________ EMPYRE ELITE XT HYDRONIC FURNACE 15 Empyre Elite XT 100 200 702112231 or 70626288 Empyre Elite XT 100 200 no 702112231 ou no 70626288 817978R00 Mode...

Page 7: ...running mode timer is then locked out 2 After loading CLOSE and LATCH door firmly and move LEVER to the right DO NOT operate with loading door open ASH REMOVAL DOOR ALWAYS OPEN SLOWLY 1 ALWAYS switch...

Page 8: ...ally hazardous situation that if not avoided MAY result in minor or moderate injury if proper practices are not taken or serves as a reminder to follow appropriate safety practices Safety Decals Pleas...

Page 9: ...PA 211 and NFPA90B Chimney must be a listed UL 103 HT or ULC S629 residential all fuel type or tile lined masonry Flue connector pipe must be made of a minimum 24 NSG black steel Special precautions a...

Page 10: ...or Panel 13 Secondary Burn Chamber 13 A Brick Configuration No Description 13 B Insulation Board Configuration 14 Ash Tray 15 Smoke Deflector Angle 16 Latch Catch Locking Bolt Front Rear Door 17 Latch...

Page 11: ...39 Electric Element Ports 40 Flue Cleaning Tool 41 Drain 42 Rear Lower Cover No Description 43 Right Side Panel 44 Supply Port 1 Elite XT 100 1 1 4 Elite XT 200 45 Flue Clean Out Cover 46 Probe Shiel...

Page 12: ...rovided that a noncombustible liner such as sheet metal or masonry be placed on the floor ensuring the following areas are covered to catch stray embers Underneath the furnace At least 16 406 mm in fr...

Page 13: ...to determine the line size necessary to meet the demands of your specific application 4 Identify each water line clearly in order to correctly locate the supply and return lines 5 Lay down 14 2 under...

Page 14: ...Sections of stove pipe minimum 24 gauge black or blued steel may be used from the furnace to the insulated chimney Note avoid using 90 Elbows 45 is recommended A chimney cap must be installed Lining m...

Page 15: ...T requires an automatic protection from low water tem perature because of the manual fuel feed Condensation water in the boiler tubes will cause corro sion and premature failure The ESO as installed i...

Page 16: ...r Line Hookup See Figures 1 to 3 Important Pump must always be in lowest part of the water line system from the Empyre Elite XT to the building Pump may be at the furnace or in the building Note The s...

Page 17: ...ill serve your needs and conforms to all local provinicial state and national codes The Pro Fab Industries warranty covers the Empyre Elite XT furnace only and does not include anything outside of the...

Page 18: ...through vent opening Figure 1 9 Check water level when water temperature is 170 F 77 C and add water until level indicator shows full Maintaining Proper Water Level When the water level is low the Em...

Page 19: ...wood when possible When using the recommended seasoned wood where the moisture content is between 19 and 25 the diameter of the wood is not that important Scenario 1 is also created when stirring a h...

Page 20: ...out ash tray 4 Reach the ash rake to the back of the chamber and pull ash forward into the ash tray Do not scrape all of the ash into the ash tray It is recommended to leave 1 2 2 5 5 1 cm of ash cov...

Page 21: ...nace WILL NOT operate To maintain optimal performance 1 Do not leave loading door open for extended periods of time especially when the fire is very hot 2 Do not force the loading door open beyond the...

Page 22: ...y A buildup in the flues and chimney will cause a poor draft and reduce efficiency 6 Check and clean the air passages in the upper loading door frame several times during the heating season To clean t...

Page 23: ...proper amount of water treatment is in the system In the event that there has been water loss through the season additional water treatment will need to be added Follow the treatment ratio on the bott...

Page 24: ...ircuit probe error Open probe error DTS Technical Data Accuracy 1 Output 16 Amp 1HP 240 Vac SPDT relay Supply voltage 115 Vac 10 Display 3 digit red DTS Programming Press SET SP text will appear on th...

Page 25: ...range 1 White Orange Yellow Blue Blue Blue Yellow Purple White Red Orange Ground 110 volts AC 60Hz Black power line White neutral line NO NC 2 CAUTION DO NOT CONNECT THE ELECTRICAL COMPONENTS OF THIS...

Page 26: ...ist 1 Check if furnace is being operated properly 2 Remove flapper unit check to ensure the flap seals in the closed position clean and oil How to Remove and Reinstall 1 Disconnect power 2 Remove blow...

Page 27: ...15 cm 6 in 15 cm Log Length 24 in 61 cm 25 in 64 cm Log Diameter 6 in 15 cm 6 in 15 cm Furnace Weight excluding pallet 1 050 lb 476 kg 1 635 lb 742 kg Water Capacity 60 US Gal 227 L 112 US Gal 424 L N...

Page 28: ...569 9 61 81 335 2 13 20 852 5 33 56 1484 5 58 45 Elite 100 Unit Dimensions 3 1 4 1 2 Not shown 0 817753 Revisions DESCRIPTION ECO Production Release 2535 REV Figure 2 Brick Layout Figure 3 Refractory...

Page 29: ...10 03 11 Production Release 816632 ECO Empyre Elite Asse 816632 81663 Revisions M D Y REV 2 4 3 2 2 2 2 4 2 2 2 4 2 2 2 2 2 2 2 2 2 2 1 1 DP APP 2745 BY 0 DESCRIPTION 10 03 11 Production Release 81663...

Page 30: ...s air passage in the firebox floor is blocked by charcoal ash Using the ash rake always stir the firebox charcoal ash into the lower ash chamber before adding wood Limit the charcoal ash buildup and l...

Page 31: ......

Page 32: ...y Registration and a copy of the original bill invoice must be forwarded to Pro Fab within thirty 30 days of the date of purchase to validate the warranty Issue Date May 2012 Part No 817969R00 Printed...

Reviews: