Empower Elektrobank 14 Manual Download Page 1

 

 Version 

5.0  

  

Page 1 of 33

 

 

 

Elektrobank 14 Installer & User Manual 

 

 

 

 

 

Empower Energy Pty Ltd 

Unit 23, 10-18 Orchard Rd 

Brookvale, NSW, 2100 

Australia 

www.empowerenergy.com.au

  

+61 (0)2 8745 8821 

Summary of Contents for Elektrobank 14

Page 1: ...Version 5 0 Page 1 of 33 Elektrobank 14 Installer User Manual Empower Energy Pty Ltd Unit 23 10 18 Orchard Rd Brookvale NSW 2100 Australia www empowerenergy com au 61 0 2 8745 8821...

Page 2: ...o meet all safety standards and CEC listing requirements 3 0 16th July 2021 Replaced Backup RCD Type B requirement with RCD Type A requirement Added 2nd option to protective earthing option 4 0 31st J...

Page 3: ...19 8 WIRING 20 8 1 External Isolation Device Requirements 20 8 2 Port Locations 21 8 3 Ferrite Attachments 22 8 4 Grid Port Including Protective Earthing 22 8 5 Backup Port 23 8 6 UPS Safety Stickers...

Page 4: ...aining 31 9 3 6 Read only inverter settings 32 10 MAINTENANCE 33 10 1 Turning off the Unit 33 10 2 User Maintenance 33 10 3 Trained Service Professional Maintenance 33 11 ELECTRICAL RATINGS 35 12 APPE...

Page 5: ...that is the time required after disconnecting the unit from all energy sources and turning off the battery circuit breaker until the capacitor energy storage in the unit is less than 48VDC 4 To indica...

Page 6: ...A battery can present a risk of electrical shock fire or explosion from vented gases Observe proper precautions Disposal Electronic Device Do not throw away Proper disposal of batteries is required Re...

Page 7: ...batteries in a fire The batteries may explode 9 CAUTION Do not open or damage batteries Released electrolyte is harmful to the skin and eyes It may be toxic 10 CAUTION The backup port should not be us...

Page 8: ...Version 5 0 Page 8 of 33 Figure 1 Warnings from product warning label...

Page 9: ...Version 5 0 Page 9 of 33 5 Dimensioned Drawing...

Page 10: ...ransformers PN AKH 0 66 K K 24 150 5A e Installer Manual f Polythene Bag containing i 28 x M6 Battery Mounting bolts ii 28 x M6 Battery Mounting Washers iii Assortment of glands and plugs for cable en...

Page 11: ...r suggested but not limited to locations include i Under an awning ii On a South Facing wall Ensure no animals or insects are likely to be able to nest close to the unit No plants can be growing insid...

Page 12: ...roduct Example Quantity Solid brick or concrete with no risk of internal voids AnkaScrew 8x100 mm Ramset Australia AS08100WGM At least 6 per system Brick or concrete with internal voids M8 glue in stu...

Page 13: ...the top of the unit to The unit cannot be mounted freestanding 3 Floor mounting can only take place on a flat concrete base A separate risk assessment shall be carried out to ensure the platform is s...

Page 14: ...reaker is turned OFF to ensure isolation Figure 5 Unit before installing batteries 5 Fit the battery modules in the below order ensuring not to trap any wires behind each module and to fix the module...

Page 15: ...modules together starting at the bottom Left Hand blue connector and working up Figure 6 Module Connections 8 Next connect the 6x BMS connectors ensuring to connect the right size into the correct rec...

Page 16: ...ery stack connections the black connector at the bottom and then the red connector at the top Figure 8 Battery Stack Connections 7 4 Close and fasten door These should be done following the following...

Page 17: ...erminal block DVC C Backup 2 x 4mm2 minimum Live and Neutral into terminal block DVC C Earth Either a or b below a Single earth cable made of copper and 10mm2 or greater but less than 16mm2 into Grid...

Page 18: ...utral to the backup circuits 2 A double pole solar PV isolator suitably rated and certified for each MPPT 3 If backup circuits are connected then this product requires a A 20A circuit breaker on the o...

Page 19: ...Recommend running all external cabling in conduit Connect cable as in the below image live L neutral N and earth earth symbol to terminal block as marked 5 Ensure the main 10mm2 minimum earth wire is...

Page 20: ...ckup wiring should wire directly to a single pole Circuit breaker with 20A tripping current 4 After the Circuit breaker each backed up house circuit should have a separate Type A 30mA RCD RCBO Figure...

Page 21: ...rid circuits and are shown below 8 7 PV Ports 1 There are 2 sets of PV connectors one for each MPPT 2 Use the following connectors ensure the right polarity wire is put into the correct connector 3 Co...

Page 22: ...d and attach DRMO Blue into pin 5 and DRM_RTN black into pin 6 of TR6 Figure 12 DRM0 Connections 8 9 Ethernet If the unit requires hard wiring to the LAN put cable through gland crimp on an RJ45 conne...

Page 23: ...or 2 For single phase the meter is powered from the grid between Un and Ua a Ensure a single pole 10A CB protects the meter 3 For 3 phase connect Ua Ub Uc and N a Ensure a 10A three phase CB protects...

Page 24: ...Version 5 0 Page 24 of 33 Figure 14 Excerpt from the Acrel ADL400 manual...

Page 25: ...e first time via its hotspot 1 Connect to the Elektrobank 14 via Wi Fi The WiFi hotspot is always turned on and the SSID and password will be on a sticker on the inside door of the unit and also affix...

Page 26: ...remind them that there are terms in the warranty that are dependent upon providing an internet connection Click on Wifi then Select Network Choose the network and enter the customers password 9 3 2 P...

Page 27: ...but the consumer can request more 6 If the network requires an export limit then enable the toggle button and select the limit value a this is normally only required if there is a 2nd inverter battery...

Page 28: ...Reactive Power Mode a Only one of Fixed Power Factor Mode or Reactive Power Mode can be chosen at any one time b This mode will output a fixed reactive power VAR regardless of the real power being inp...

Page 29: ...6 Read only inverter settings Once set the country grid code protection settings power quality response modes region settings firmware version and other installer settings can be viewed in a read onl...

Page 30: ...service technician if you see any signs 4 Then with a dry cloth or soft brush clean the whole product Make sure all debris is cleared 10 3 Trained Service Professional Maintenance Scheduled maintenanc...

Page 31: ...spected that the external fan heat exchanger or heatsink is blocked then a gentle water flow 1L min can be initiated from the ventilation holes in the back of the unit ensure the front door is fully c...

Page 32: ...Icw 6kA Active Apparent Power Continuous 3 5kW 3 5kVA Active Apparent Power Overload 4 6kW 4 6kVA for 1 hour Maximum Inrush Current 30Apeak for 1s Power Factor 0 6 Number of Phases 1 Maximum Output O...

Page 33: ...rrect The minimal connection for programming is a 230v connection between UA and UN on the top panel To change a setting press until a digit starts to flash To change that digit use the button To move...

Reviews: