INSTALLATION PROCESS
A.
Arch Frame Installation
1. (Part No. 1* 1 unit + part No. 2 * 1 unit +
part No. 3A* 2 unit) Please find the 1 piece
of Male Bent Tubes (part No. 1), one piece
of Female Bent Tubes (part No. 2) and
2 pieces of Stake Peg for front wall (part
No. 3A). Connect them to make one group
arch.
2. (Part No. 1* 1 unit + part No. 2 * 1 unit +
part No. 4* 2 unit) Please find the 1 piece
of Male Bent Tubes (part No. 1), one piece
of Female Bent Tubes (part No. 2) and 2
pieces of Stake Peg for middle arch frame
(part No. 4). Connect them to make the
second group arch. By turns, there are 6
groups of arches.
1
2
3
1
2
3a
3a
10
11
15
15
18
19
4
7
6
11
5
9