26284-3-0813
Page 8
Check all local codes for requirements, especially for the size and
type of gas supply line required.
NOTICE
:
Never use plastic pipe. Check to confirm whether your
local codes allow copper tubing or galvanized.
NOTICE
:
Since some municipalities have additional local codes, it is
always best to consult your local authority and installation code.
Installing a New Main Gas Cock
Each appliance should have its own manual gas cock.
In the state of Massachusetts the gas cock must be a T handle
type.
A manual main gas cock should be located in the vicinity of the unit.
Where none exists, or where its size or location is not adequate,
contact your local authorized installer for installation or relocation.
Compounds used on threaded joints of gas piping shall be resistant
to the action of liquefied petroleum gases. The gas lines must be
checked for leaks by the installer. This should be done with a soap
solution watching for bubbles on all exposed connections, and if
unexposed, a pressure test should be made.
Never use an exposed flame to check for leaks. Appliance must
be disconnected from piping at inlet of control valve and pipe
capped or plugged for pressure test. Never pressure test with
appliance connected; control valve will sustain damage!
A gas valve and ground joint union should be installed in the gas
line upstream of the gas control to aid in servicing. It is required by
the National Fuel Gas Code that a drip line be installed near the gas
inlet. This should consist of a vertical length of pipe tee connected
into the gas line that is capped on the bottom in which condensation
and foreign particles may collect.
The use of the following gas connectors is recommended:
— ANS Z21.24 Appliance Connectors of Corrugated Metal Tubing
and Fittings
— ANS Z21.45 Assembled Flexible Appliance Connectors of Other
Than All-Metal Construction
The above connectors may be used if acceptable by the authority
having jurisdiction. The state of Massachusetts requires that a flexible
appliance connector cannot exceed three feet in length.
Figure 4
Pressure Testing of the Gas supply system
1. To check the inlet pressure to the gas valve, a 1/8" (3.175mm)
N.P.T. plugged tapping, accessible for test gauge connection, must
be placed immediately upstream of the gas supply connection
to the appliance.
2. The appliance and its individual shutoff valve must be disconnected
from the gas supply piping system during any pressure testing of
that system at test pressures in excess of 1/2 psig (3.5 kPa).
3. The appliance must be isolated from the gas supply piping system
by closing its individual manual shutoff valve during any pressure
testing of the gas supply piping system at test pressures equal
to or less than 1/2 psig (3.5 kPa).
Attention!
If one of the procedures results in pressures in excess
of 1/2 psig (14" w.c.) (3.5 kPa) on the appliance gas valve, it will
result in a hazardous condition.
Checking Manifold Pressure
VsR
Natural gas models will have a manifold pressure of approxi-
mately 3.5" w.c. (.871kPa) at the pressure regulator outlet with the
inlet pressure to the pressure regulator from a minimum of 4.5" w.c.
(1.120kPa) for the purpose of input adjustment to a maximum of
10.5" w.c. (2.615kPa).
VsM
Natural gas models will have a mani-
fold pressure of approximately 4.5" w.c. (1.12kPa) at the pressure
regulator outlet with the inlet pressure to the pressure regulator
from a minimum of 7.0" w.c. (1.74kPa) for the purpose of input
adjustment to a maximum of 10.5" w.c. (2.615kPa).
VsR and VsM
Propane gas models will have a manifold pressure approximately
10.0" w.c. (2.49kPa) at the pressure regulator outlet with the inlet
pressure to the pressure regulator from a minimum of 11.0" w.c.
(2.739kPa) for the purpose of input adjustment to a maximum of
13.0" w.c. (3.237kPa).
VsM
NOTICE
:
A test gage connection is located downstream of the gas
appliance pressure regulator for measuring gas pressure. The con-
nection is a 1/8 inch 3mm) N.P.T. plugged tapping.
VsR
NOTICE
:
The gas control is equipped with a captured screw type
pressure test point, therefore it is not necessary to provide a 1/8"
test point up stream of the control.
GAs suPPly
Recommended Gas Pipe diameter
Pipe Length
Schedule 40 Pipe
Inside Diameter
Tubing, Type L
Outside Diameter
Nat.
L.P.
Nat.
L.P.
0-10 feet
0-3 meters
1/2”
12.7mm
3/8”
9.5mm
1/2”
12.7mm
3/8”
9.5mm
10-40 feet
4-12 meters
1/2”
12.7mm
1/2”
12.7mm
5/8”
15.9mm
1/2”
12.7mm
40-100 feet
13-30 meters
1/2”
12.7mm
1/2”
12.7mm
3/4”
19mm
1/2”
12.7mm
100-150 feet
31-46 meters
3/4”
19mm
1/2”
12.7mm
7/8”
22.2mm
3/4”
19mm