Step 8:
If more than a small amount of
media is found in the dust collector
waste, additional reclaimer tuning band
adjustment may be required.
Follow
Steps 9 through 13.
Step 9:
Adjust the tuning band back to
the previous reference mark on the
reclaimer body,
reducing the opening
between the reclaimer and the band.
Step 10:
After operating the blast
system for at least one (1) hour, turn
the cabinet power switch OFF. Inspect
the dust drum waste for reusable
media.
Step 11:
If no media is found in the
waste, adjust the tuning band to expose
1/16”
less
reclaimer body slot area.
Step 12:
Make a new reference mark
on the reclaimer body.
Step 13:
Repeat
Steps 8 through 13
until a small amount of media is found
in the dust collector waste. Adjustment
is complete.
The schematic diagrams in Figure 13 illustrate:
(1) the basic operation of the system.
(2) the air and media flow before and after blasting.
Figure 13. Operating Principles