Empire Products RH-25-6 Installation Instructions And Owner'S Manual Download Page 14

Page 14

12821-2-0903

DRB-1 For Vented Room Heaters

Models

RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6)

Direct Vent Wall Furnaces DV-25-(1, 2)SG and DV-35-(1, 2)SG

Installing Optional DRB-1 Blower
1.

For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6),
remove casing front.

1.

For DV-25-(1, 2)SG and DV-35-(1, 2)SG, remove casing
front and heat shield.

2.

When facing appliance, insert blower assembly into the
left section of the casing (adjacent to the combustion
chamber).

3.

For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6), route
cord set through opening in casing back.  The opening in
casing back is located adjacent to gas control.

3.

For DV-25-(1, 2)SG and DV-35-(1, 2)SG, route cord set
through opening in casing bottom.  The opening in casing
bottom is located beneath gas control.

4.

Align the (2) screw holes on the inner side panel and the
(2) screw holes on casing back with the (4) clearance holes
on the blower assembly.  Attach blower assembly to the
casing back and inner side panel with (4) #10 x 1/2"
(13mm) screws provided.  The blower assembly must be
attached first to the casing back and then to the casing side
panel.

5.

For RH-25-(1, 2, 4, 5, 6) and RH-35-(1, 2, 4, 5, 6),
replace casing front.

5.

For DV-25-(1, 2)SG and DV-35-(1, 2)SG, replace heat
shield and casing front.

Attention:  Wiring harness on blower is factory assembled and
installed.  If wiring harness becomes disassembled use the
following steps to reassemble the wiring harness.

1.

Attach (1) pin terminal from black (hot) wire, smooth
insulation on cord set to (1) socket terminal on fan control
assembly.

2.

Attach (1) pin terminal from black (neutral) wire, ribbed
insulation on cord set to (1) socket terminal from white
(neutral) wire on motor.

3.

Attach (1) pin terminal on fan control assembly to (1)
socket  terminal from black (hot) wire on motor.

4.

Attach green ground wire beneath one of the #10 x 1/2"
(13mm) screws on the blower housing.

Fan Control
The automatic fan control is located in the switch box.  The
switch box is attached to the front of the blower assembly.   The
switch box is adjacent to the combustion chamber.  The fan
control is a non-adjustable automatic type.  The fan control
will require between 5 and 10 minutes of main burner opera-
tion before the fan control “closes” and activates the blower.
The blower will continue to run between 5 and 10 minutes after
the main burner shuts off, before the fan control “opens” and
deactivates the blower.

OPTIONAL BLOWER INSTALLATION INSTRUCTIONS

Summary of Contents for RH-25-6

Page 1: ...iance Donottouchanyelectricalswitch donotuseanyphoneinyourbuild ing Immediatelycallyourgassupplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas sup plier...

Page 2: ...ng 7 Vent Safety Shutoff System 8 Reversible Vertical or Horizontal Diverter 8 Thermostat Operation 8 Lighting Instructions 9 Pilot Flame Characteristics 10 Main Burner Flame Characteristics 10 Mainte...

Page 3: ...ir passageways of the room heater be kept clean DO NOT put anything around the heater that will ob struct the flow of combustion and ventilation air See clearances DO keep the appliance area clear and...

Page 4: ...service or make adjustments in an area where the conditions are such that you may not detect the odor if there has been a leak of LP Gas Odor fade due to oxidation by rust or adsorption on walls of n...

Page 5: ...olor tile that can discolor Floor pad is available from Empire Comfort Systems Inc Part Number DVP 1 Qualified Installing Agency Installation and replacement of gas piping gas utilization equip ment o...

Page 6: ...Never pressure test with appliance connected control valve will sustain damage A gas valve and ground joint union should be installed in the gas line upstream of the gas control to aid in servicing I...

Page 7: ...l be installed in a location in which the facilities for ventilation permit satisfactory combustion of gas and proper venting under normal conditions In buildings of conventional frame brick or stone...

Page 8: ...al position to the horizontal position 1 Remove L280 vent safety switch from the draft diverter 2 Inside your yellow instruction envelope will be a 1 1 2 x 2 1 4 38mm x 51mm vent safety switch hole co...

Page 9: ...mediately call a qualified service techni cian to inspect the appliance and to replace any part of the control system and any gas control which has been under water LIGHTING INSTRUCTIONS 1 Set thermos...

Page 10: ...lot orifice Figure 5 MAIN BURNER FLAME CHARACTERISTICS There will be a short blue inner flame with a larger lighter blue secondary flame The burner flame may have yellow tips when hot Dust in the comb...

Page 11: ...uple 3 Pilot flames but goes out when knob is released a Pilot flame not covering the thermocouple properly b Defective thermocouple c Defective magnet in the safety section of valve 4 Poor thermostat...

Page 12: ...737 Burner RH 25 6 23 RH 738 Burner RH 35 6 24 R 1195 Thermocouple 36 25 R 1227 Pilot Burner with Orifice Nat 25 R 1228 Pilot Burner with Orifice LPG 26 11698 Pilot Tubing 27 R 6120 Electrode and Wir...

Page 13: ...Page 13 12821 2 0903 PARTS VIEW...

Page 14: ...5 6 and RH 35 1 2 4 5 6 replace casing front 5 For DV 25 1 2 SG and DV 35 1 2 SG replace heat shield and casing front Attention Wiring harness on blower is factory assembled and installed If wiring h...

Page 15: ...rvicing WARNING Unplugging of blower accessory will not stop the heater from cycling To shut heater off 1 Turntemperaturedial orthermostattolowestsetting 2 Turnknobongascontrolto OFF depressingslightl...

Page 16: ...E NOTES Empire Comfort Systems Inc Nine Eighteen Freeburg Ave Belleville Illinois 62220 2623 PH 1 618 233 7420 PH 1 800 851 3153 FAX 1 618 233 7097 FAX 1 800 443 8648 E MAIL info empirecomfort com WEB...

Reviews: