23
GB
high front
panel
Upper screw
Cover
Upper screw
Front screw
Top cap
Insulated pipe 1
Gasket
Vent valve
Ball valve
3/4”
Circulator
pipe union
Insulated pipe 1
Gasket
Ball valve
3/4”
Gasket
Insulated pipe 2
Vent valve
Gasket
Gasket
circular
insulation
Fig. 2E
INSTALLATION INSTRUCTIONS
“P2 CIRCULATOR KIT”
Work safely
- Disconnect the power supply to the ITM 200 unit
and make sure the temperature and pressure
of the water are such as to be able to perform the
intervention.
Fig.2A)
Remove the “HIGH FRONT PANEL” by unscrewing
the upper screw and sliding the panel upwards.
Fig.2B)
Remove the “COVER” by unscrewing the 2 upper
screws and the 2 front screws.
Fig.2C)
Remove the 2 upper caps of the buffer tank
25 liters to install “PIPE 1” and then the “CIRCU-
LATOR” with “PIPE 2”. Use all the components as
shown in the figure. Make sure there are no leaks
from the hydraulic circuit.
Electrically connect the circulator to the electrical
panel following the diagram inside the electrical
panel. Pass the circulator power cable through the
input on the electrical panel.
Check the correct operation of the unit complete
with “CIRCULATOR P2 KIT”.
Reassemble the previously removed aesthetic pan-
els in reverse order.