c
11
2
3
1
1-Before mounting the device in your
panel, make sure that the cut-out is of the
right size.
2-Check front panel gasket position
3-Insert the device through the cut-out. If
the mounting clamps are on the unit, put out
them before inserting the unit to the panel.
2.5 Panel Mounting
Operating Temperature :
0 to 50 °C
Max. Operating Humidity :
90% Rh (non-condensing)
Altitude
:
Up to 2000m.
Operating Conditions
Forbidden Conditions:
Corrosive atmosphere
Explosive atmosphere
Home applications (The unit is only for industrial applications)
2.4 Environmental Ratings
c
During installation into a metal panel, care should be taken to avoid injury from
metal burrs which might be present. The equipment can loosen from vibration
and become dislodged if installation parts are not properly tightened. These
precautions for the safety of the person who does the panel mounting.