ROBERT TRUJILLO RT SET Page 4
Diagram #8
If the instrument has a Battery Holder:
If your instrument has a 9 or 18 Volt battery holder you can still
use the EMG Connectors to supply power to the pickups.
Simply cut and strip the wires from the battery clip provided.
Twist the wires together (Red to Red and Black to Black) and
use the shrink tubing included to cover the connections.
Soldering the wires is recommended.
9/18 VOLT
BATTERY
HOLDER
Cover these connections with the
shrink tubing provided.
BLACK to RING terminal
of the Output Jack
RED to BATTERY OR PICKUP BUSS
BLACK to RING terminal
of the Output Jack
RED TO BATTERY BUSS (+18Volts)
Diagram #9
TONE
B124rH
TONE
B124rH
VOLUME
B122rH
VOLUME
B122rH
RED
RED
RED
T
R
S
NK VOLUME
FROM NECK PICKUP
FROM BRIDGE PICKUP
BR VOLUME
BATTERY
NEG (-)
NK TONE
BR TONE
OUTPUT CABLE
- 9V +
GROUND
BRIDGE P/U
NECK P/U
OUTPUT
- 9V +
- 9V +
T
R
S
RED
BLACK
2 Pickups / Toggle Select Switch / 2 Volumes and 2 Tones
Refer to Diagram #7
1) Install the Pickups and route the cables to the control cavity.
If the cables are too long, wind up the excess and keep it under the pickup.
2) Mount the Volume and Tone controls into the body
Plug both Neck and Bridge pickup cables onto the Volume Controls as shown.
Plug a connect cable from the Bridge (BR) Volume control to the Pickup Buss
(Position 1).
Plug a connect cable from the Neck (NK) Volume control to the Pickup Buss
(Position 2).
3) Plug a connect cable from the Bridge (BR) Volume control to the Bridge (BR) Tone
control as shown.
4) Plug a connect cable from the Neck (NK) Volume control to the Neck (NK) Tone
control as shown.
5) Strip the insulation from the switch wires and Insert them into the GREEN
Terminal Block and tighten the screws with a small screwdriver.
The Bridge pickup goes to the BR Terminal
The Neck Pickup goes to the NK Terminal
The Output of the switch goes to the O Terminal
If there is a ground wire coming from the switch, insert it into one of the black
terminals on the terminal block.
6) Plug the output cable onto the Pickup Buss (Position 3) and push the connectors
onto the jack as shown.
WHITE wire onto the TIP (T) contact,
BLACK wire onto the SLEEVE (S) contact
BLACK Battery Negative wire onto the RING (R) contact.
7) Plug the RED Wires of the pickups onto the V+ Supply Buss (RED Shroud)
along with the RED of the battery clip. Extra pins are for EMG Accessories.
8) Wrap the battery in a piece of insulating foam and place it securely in the
control cavity. We suggest that you plug in the instrument and test it before
closing the control cavity.
Diagram #7
2 Pickups
2 Volume (either volume will act as a master)
2 Tone
Toggle Style Switch
+18 Volt Wiring Option:
If you want to operate your instrument at +18 Volts for more
headroom then use 2 batteries wired as below.
Also, if you are using any type of EQ in your instrument
(EMG-BT, BQ) or anything that boosts the pickup signal then
+18 Volts is recommended.
Solder the Black and Red
wires together and cover
the connection with shrink
tubing, or other insulation.