
3
Important Note
Before applying power to the VISSION MicroController panel, all wiring to the panel should be per NEC.
Specifically check for proper voltage and that the neutral is grounded at the source. An equipment ground
should also be run to the panel.
*See Wiring Instructions and Diagrams before proceeding.
Before start-up you need to enter all system values and options, see section on Setpoint Values.
“Before powering the Vission control panel down”,
it is a good idea to Backup Control Settings to insure
that all previously changed setpoints have been properly saved. See section on saving changes. After back-
ing up the setpoints
DO NOT
power down the Vission panel for at least 1 minute. This will allow adequate
time for all setpoints to be properly saved.
Note: The screen shots depicted in this manual represent the screens corresponding to
Vission program version # 2.4.41, the current version at time of printing. In our effort
to continuously improve the functionality and ease-of-use of the Vission Micro-con-
troller, the look of some screens may differ slightly than the representations shown
here.
Equipment Indentification Numbers:
Vilter Order Number: __________________________Serial Number: _____________
Vilter Order Number: __________________________Serial Number: _____________
Vilter Order Number: __________________________Serial Number: _____________
Summary of Contents for Vission
Page 1: ...Vission Control Manual ...
Page 2: ...2 ...
Page 4: ...4 ...
Page 8: ...8 Operational Flow Chart ...
Page 9: ...9 Operational Flow Chart cont ...
Page 10: ...10 ...
Page 11: ...11 Wiring Instructions ...
Page 19: ...19 Note Page ...
Page 20: ...20 Wiring Diagram For Vission Only ...
Page 21: ...21 Wiring Diagram For Vission Only ...
Page 59: ...59 Slide Wiring Diagram for Models Vission VSM 91 To VSS 601 ...
Page 60: ...60 Slide Wiring Diagram for Models Vission VSS 751 To VSS 1801 ...
Page 73: ...73 Supressor Kit Installation ...
Page 79: ...79 Transducer Wiring ...
Page 89: ...89 ...