background image

4

VAREC

 7100B SERIES PRESSURE RELIEF VALVE

INSTRUCTION, OPERATION AND MAINTENANCE MANUAL

4.  Place the valve in a level position. Check the 

pallet operation by reaching up through the 
inlet flange and carefully pushing up on the 
pressure pallet, then lowering it onto the 
seat. Pallet should move up and down freely 
and rest flat on the seat ring.

5.  Mount the valve on the flanged nozzle or 

flame arrester using the appropriate full 
faced gasket.

CAUTION

DO NOT MATE A FLAT FACE FLANGE TO A 
RAISED FACE FLANGE.
If it necessary to mate a flat face flange with 
a raised face flange, use the proper spacer to 
convert the raised face to a flat face.

6.  Verify that the valve is level to permit proper 

operation of the pallet. Install mounting 
hardware, and tighten uniformly.

NOTE

I

t is recommended that steel valves be given a coat 

of paint immediately after installation is completed. 
Apply paint to external surfaces only.

WARNING

• Relief valve must be isolated from tank pressure 

before servicing. All gas must be blocked and 
pressure safely vented. If no isolation valve is 
present, carefully lift pallet, allowing pressure 
to vent slowly.

 • Wear appropriate gloves and/or breathing 

apparatus if hazardous vapors are present.

MAINTENANCE (ASSEMBLING AND 
DISMANTLING)

The valve should be inspected and cleaned 
at periodic intervals. The first inspection 
should be made approximately 30 days after 
commissioning. Subsequent inspections should 
be made every 30 days. The user may adjust the 
schedule for his own convenience and safety, 
depending upon the product being stored.

1.  To inspect valve, proceed as follows:
  a)   Remove weatherhood and then the 

pallet assembly.

  b)   Inspect pallet inserts for ripples, tears, 

or nicks, as well as seating surfaces for 
debris, abrasion or pitting. Pallet edges 
and guide posts should be free of burrs, 
corrosion or other obvious damage. 
Clean all components, replacing any 
showing excess wear or damage. On 
the “All-Weather” versions, inspect the 
PTFE coating for any damage that would 
affect operation.

  c)  Reassemble in reverse order.

CAUTION

The end of the pallet stem must engage the stem 
guide in the weatherhood for proper seating and 
valve operation.

CAUTION

During periods of freezing weather, extra 
maintenance is required for 7100B Series. Either 
remove the pallet or apply generous portions of 
silicone grease to the pallet, seat ring and guide 
posts. When using silicone grease, inspect valves 
at least weekly. This procedure is not required for 
the “All-Weather” Model 7101B.

3.  To load pallet weights perform the following:
  a)   Remove pressure pallet assembly 

from body.

  b)  Remove grip ring from pallet stem. 
  c)   Non-variable setting: Locate weight 

marked “PRESSURE” and place on top 
of compensating weight and/or pallet.  
Secure with grip ring.  If setting is less 
than 2” WC, weight will be pre-loaded on 
the pallet.

  d)   Variable setting: each lead weight 

is calibrated from 1” WC increment. 
(Increments of ¼” WC and ½” WC may 
be supplied on special order). Those 
weights necessary for the initial specified 
setting will be tagged separately from 
any extra weight provided. Remove the 
packaging on the weights tagged for the 
initial specified setting and place the 
weights on top of the pallet. Secure with 
grip ring. Store remaining weights for 
future use (in case the setting needs to 
be increased).

  e)   Weigh entire pallet assembly (including 

installed weights). Using the Calibration 
Table, confirm that the assembly is the 
proper weight to achieve the required 
setting. Allowable weight tolerance is 
+5%,-5%.

  f)   Remove any remaining packing material 

from valve body. Wipe pressure seat ring, 
guide posts and pallet assembly with a 
soft cloth to remove any material which 
could affect valve operation.

  g)   Place pallet assembly on valve body 

seat. Ensure that pallet moves freely 
within guide posts and rests flat on the 
seat ring.

  h)   Replace the weatherhood and tighten all 

nuts uniformly.

CAUTION

The end of the pallet stem must engage the stem 
guide in the weatherhood for proper seating and 
valve operation.

Summary of Contents for VAREC 7100B Series

Page 1: ...bility shall be limited to repair or replacement under the standard warranty clause In no case shall Emerson liability exceed that stated as Limitations of Remedy in the contract between Emerson and our customer SAFETY PRECAUTIONS Read and understand this instruction manual before installing operating or performing maintenance on 7100B Series pressure relief valves Follow all precautions and warni...

Page 2: ...Stainless steel Steel 316 Stainless steel 316 Stainless steel 316 Stainless steel Code Insert Material T B V Fluorinated Ethylene Propylene FEP Nitrile NBR Fluorocarbon FKM Code Flange Drilling F D 150 ANSI Drilling PN 16 DIN Drilling Code Flange Face F R Flat Face Flange Raised Face Flange Not Available with Aluminum Code Gasket O ring Material O B T V Standard Nitrile NBR Polytetrafluoroethylene...

Page 3: ... ensure proper operation of the relief valve 1 Remove the valve from the shipping container Check to see if extra loading weights were bagged and packed separately 2 Remove the weatherhood and or cover s and all packing material above the pallet and within the valve CAUTION Whenever the weatherhood is removed and reinstalled the end of the pallet stem must engage the stem guide in the weatherhood ...

Page 4: ... excess wear or damage On the All Weather versions inspect the PTFE coating for any damage that would affect operation c Reassemble in reverse order CAUTION The end of the pallet stem must engage the stem guide in the weatherhood for proper seating and valve operation CAUTION During periods of freezing weather extra maintenance is required for 7100B Series Either remove the pallet or apply generou...

Page 5: ...ad and light oil CAUTION Whenever the weatherhood is removed and reinstalled the end of the pallet stem must engage the guide tube in the weatherhood for proper pallet seating and valve operation CALIBRATION ADJUSTMENT It is important to verify setting by calculating the total necessary weight using Table 3 Check this value against the actual weight of the pallet assembly including loading weights...

Page 6: ...24 541 10 27 26 686 660 12 34 3013 16 864 783 VAREC 7100B SERIES PRESSURE RELIEF VALVE INSTRUCTION OPERATION AND MAINTENANCE MANUAL FIGURE 3 MODEL 7100B LOW SETTING Drilling per ANSI Class 125 F F FIGURE 4 MODEL 7100B HIGH SETTING Drilling per ANSI Class 125 F F TABLE 4 MODEL 7100B LOW SETTING SIZES AND DIMENSIONS Size A in mm B in mm TABLE 5 MODEL 7100B HIGH SETTING SIZES AND DIMENSIONS Size A in...

Page 7: ...02 11413 306 02 11413 406 02 11415 306 02 11415 206 7 Guide post Low set 316 SST 02 11414 106 02 11414 206 02 11416 106 02 11416 206 High set 316 SST 02 11414 306 02 11414 406 02 11416 306 02 11416 206 8 Spacer ring All Aluminum B14389 011 B14439 011 B14449 011 B16113 011 All Steel B14389 003 B14439 003 B14449 003 B16113 003 All 316 SST B14389 006 B14439 006 B14449 006 B16113 006 9 O Ring All Nitr...

Reviews: