Wireless considerations

Power up sequence

The Emerson Smart Wireless Gateway should be installed and functioning
properly before any wireless devices are powered. Commission the
Rosemount ET210 and install the BP20E power module to power the device
only (following instructions below) after the gateway has been installed and
functioning. This results in a simpler and faster network installation.
Enabling active advertising on the Gateway ensures new devices are able to
join the network faster. For more information see the Smart Wireless
Gateway Manual (document number 00809-0200-4420).

Antenna position

The antenna is internal to the ET210 transmitter. The antenna should also be
approximately 3 ft. (1 m) from any large structure, building, or conductive
surface to allow for clear communication to other devices.

June 2019

Quick Start Guide

Quick Start Guide

7

Summary of Contents for Rosemount ET210

Page 1: ...Quick Start Guide 00825 0100 4211 Rev AA June 2019 Rosemount ET210 Wireless Corrosion Transmitter ...

Page 2: ...re make sure the instruments in the segment are installed in accordance with intrinsically safe or non incendive field wiring practices This device complies with Part 15 of the FCC Rules Operation is subject to the following conditions This device may not cause harmful interference This device must accept any interference received including interference that may cause undesired operation This devi...

Page 3: ...Contents Overview 5 Wireless considerations 7 Field communicator connections 8 Physical installation 9 Commissioning device 12 Product certifications 15 June 2019 Quick Start Guide Quick Start Guide 3 ...

Page 4: ...Quick Start Guide June 2019 4 Emerson com RosemountEmerson com Rosemount ...

Page 5: ...1 Overview Figure 1 1 Rosemount ET210 Wireless Corrosion Transmitter A Antenna B Power module C Head D Lanyard hole E Strap slot F Foot G Cap H Shoe June 2019 Quick Start Guide Quick Start Guide 5 ...

Page 6: ... 2000 1 3 What s in the box Permasense ET210 sensor complete with protective cap Lanyard kit 316 stainless steel lanyard 6 5ft 2m in length Gripple No 2 release key Silicone rubber shoe Strap kit comprising polymer strap and buckle Permasense BP20E power module M3 x 16mm stainless steel retaining bolts two per sensor Quick Start Guide June 2019 6 Emerson com RosemountEmerson com Rosemount ...

Page 7: ...unctioning This results in a simpler and faster network installation Enabling active advertising on the Gateway ensures new devices are able to join the network faster For more information see the Smart Wireless Gateway Manual document number 00809 0200 4420 Antenna position The antenna is internal to the ET210 transmitter The antenna should also be approximately 3 ft 1 m from any large structure ...

Page 8: ...nsmitter in the same way as BP20E power module The USB connector is plugged in to the tablet PC as shown in Figure 3 1 Figure 3 1 IK220 Commissioning Kit A Tablet PC B CC21 C USB cable plugged into USB port D WT210 ET210 sensor Quick Start Guide June 2019 8 Emerson com RosemountEmerson com Rosemount ...

Page 9: ... when the cap is removed Ensure the metal ring and the rubber shoe are fitted before installing the sensor If either part is missing do not proceed with the installation 3 Place the sensor in the required location on the pipe Note The magnets used in the sensors have a high pull force To avoid damage and to get the precise location for each sensor put the sensor at an angle to the pipe and then ge...

Page 10: ...ensure correct alignment around the circumference of the pipe With multiple sensors on a strap there should be a gap between the shoes of adjacent sensors 8 Prepare the lanyard kit and decide how it will be positioned Wrap the lanyard around the circumference of the pipe The 7 ft 2m length will accommodate a maximum diameter of 24 in When it is not possible to wrap the lanyard around a pipe find a...

Page 11: ... bare end through the lanyard hole in each sensor and then into the return hole of the gripple Note The wire can be released from the gripple using the release key June 2019 Quick Start Guide Quick Start Guide 11 ...

Page 12: ...pp software a a The sensor ID and MAC address of the sensor should be displayed at the top of the screen within 10 seconds b b Select the Provision tab c Enter the five digit network ID and the 32 hexadecimal numbers 0 9 and letters A F join key d Click the Provision button Confirmation is given when provisioning is complete e Check in the Network Discovery panel to confirm that the sensor can hea...

Page 13: ...o that the rubber shoe is compressed slightly and the sensor is held in place securely On small diameter pipes the curved part of the shoe should touch the pipe Overtightening the strap will deform the shoe and could damage the sensor Note For the same tension in the strap more force is exerted on the shoe on smaller diameter pipes Correct strap tension Strap too loose shoe not compressed Strap to...

Page 14: ...large network of 100 sensors this can often take 2 hours and sometimes up to 6 hours 8 Sensor installation is complete Quick Start Guide June 2019 14 Emerson com RosemountEmerson com Rosemount ...

Page 15: ...interference This device must accept any interference received including interference that may cause undesired operation This device must be installed to ensure a minimum antenna separation distance of 20 cm from all persons 6 4 Ordinary Location Certification As standard the transmitter has been examined and tested to determine that the design meets the basic electrical mechanical and fire protec...

Page 16: ...re may present a potential electrostatic ignition hazard and must not be rubbed or cleaned with a dry cloth International I7 IECEx Intrinsically Safe IS Certificate BAS 15 0098X Issue 5 Standards IEC 60079 0 2017 Edition 7 0 IEC 60079 11 2011 Edition 6 0 Markings Ex ia IIC T4 Ga Tamb 50 ºC to 75 ºC IP67 Specific conditions for safe use X 1 The plastic mounting foot may present a potential electros...

Page 17: ...6 7 Declaration of Conformity Figure 6 1 Declaration of Conformity June 2019 Quick Start Guide Quick Start Guide 17 ...

Page 18: ...6 8 China RoHS Quick Start Guide June 2019 18 Emerson com RosemountEmerson com Rosemount ...

Page 19: ...June 2019 Quick Start Guide Quick Start Guide 19 ...

Page 20: ...x 1046 CH 6340 Baar Switzerland 41 0 41 768 6111 41 0 41 768 6300 RFQ RMD RCC Emerson com Asia Pacific Regional Office Emerson Automation Solutions 1 Pandan Crescent Singapore 128461 65 6777 8211 65 6777 0947 Enquiries AP Emerson com Middle East and Africa Regional Office Emerson Automation Solutions Emerson FZE P O Box 17033 Jebel Ali Free Zone South 2 Dubai United Arab Emirates 971 4 8118100 971...