Process Flange Reassembly
1. Replace the process c-rings (9) with new c-rings if the
flange (10) was removed. Carefully place one c-ring in
each of the two weld rings located on the isolating
diaphragms of the sensor module (8) as shown in
2. Carefully place the process flange on the sensor
module. Take care not to disturb the c-rings or
damage the isolating diaphragms.
Figure 5-12 – Process C-rings
3. With the process flange sitting securely on the sensor
module, install two flange cap screws (13) into the
flange location shown in
. Install the cap
screws finger tight.
4. Place the four bolts (11) through the process flange
and screw them on finger-tight.
5. Using a hand torque wrench, evenly seat the flange
onto the sensor module by following steps 6 through 9
(see
6. Alternately tighten the four bolts in the sequence
shown in
to 150 in-lbs ±15 in-lbs (16.9 N-
m ± 1.7 N-m)
7. Repeat step 6.
8. Repeat step 6 at 300 in-lbs ± 25 in-lbs (33.9 N-m ± 2.8
N-m)
9. Repeat step 8.
10. Torque the two cap screws in the flange to 33 in-lbs ±
1.7 in-lbs (3.7 N-m ± 0.2 N-m). NOTE: Cap screws
must be torqued after bolts, or they will loosen.