1.4

 

Installation

 

Before starting installation, determine whether the analyzer/transmitter will be calibrated at 

the bench or on-line. If bench calibration is to be performed, wiring instructions can be found 

at the end of this section and calibration procedures can be found in Section 1.5.

 

Installation of the 245 Flow Through Sensor is similar to installation of a section of pipe. 

Consequently, be prepared to use tools, supplies, equipment, and techniques similar to 

those used to install process pipes. Use common piping practices to minimize torque and 

bending loads on process connections. Observe all applicable safety standards. Dimensional 

information is shown in Figure 1-2 below.

 

 

  Note 

 

1.

 

The sensor should be installed into a straight section of piping at least 4 pipe diameters

 

in length on either side of the sensor to optimize sensor performance.

 

2.

 

The sensor should be installed at an orientation that will keep the sensor filled with 

process solution at all times during which measurements are being made. Avoid 

downward flowing solutions as such a configuration might leave the sensor partially 

empty.

 

Installing the Sensor in the Process Line

 

1.

 

Install Tri-Clamp flanges onto pipes in accordance with applicable instructions, standards,

 

and local regulations.

 

2.

 

Position the sensor between the Tri-Clamp flanges with the flange gaskets inserted 

between each set of flanges. Ensure that the locations of the junction box connection and 

the RTD are suitable for ease of the remainder of installation, wiring, and use.

 

Installing the Pt100 RTD

 

1.

 

Use of the optional Pt100 RTD is recommended. Use of a customer-supplied Pt100 or 

Pt1000 TC mounted in a separate thermowell is also acceptable.

 

2.

 

Thread the RTD wires into junction box. Wire the RTD to the j-box terminals as indicated in

 

Figure 1-4. Use of optional kit PN 24086-00 is recommended.

 

Extension Cable Hook-Up

 

1.

 

Sensor cable should not be run in conduit or open trays with any A.C. power wiring, nor 

routed near heavy electrical equipment.

 

2.

 

For best sensor/instrument loop performance, using the preprepared extension cable (PN 

23909-00) is recommended. (Using a different cable can introduce noise into the signal 

and/or reduce loop accuracy.)

 

3.

 

One end of extension cable (PN 23909-00) has 8 wires, and the other end has 11 wires. 

Refer to Figure 1-4. The end with only 8 wires goes into the junction box. The end with 11 

wires goes to the instrument.

 

 

  Note 

 

If starting with unprepped cable (PN 9200276), remove only as much insulation as is 

necessary. The instrument end needs 11 leads: four leads from the green-white-black- 

drain bundle, three from each of the two coaxial cable bundles (the inner conductor, the 

insulating braid, and the drain wire), and one from the outermost overall braided-copper 

shield. For the junction-box end, only 8 leads are used: the white coaxial conductor, its 

braided shield, the green coaxial conductor, its braided shield, its drain wire, and the green, 

white, and black conductors from the green-white-black-drain bundle. The remaining 

shields and drain wires are not used on the J-box end and should be removed -- they should 

NOT be connected or allowed to short to any other conductor or the junction box.

 

 

4.

 

Connect the 8 wires of the extension cable to the terminal block inside the sensor’s

 

junction box as indicated in Figure 1-3 and Figure 1-4.

 

5.

 

Connect the 11 wires of the instrument-end of the extension cable according to the 

applicable diagram from Figures 1-5 through 1-9, the Wiring Instruction Sheet, or the 

instrument’s instructions.

 

 
 

 

245 Sensor 

3

 

Summary of Contents for Rosemount 245

Page 1: ...Instruction Manual LIQ MAN 245 Rev E June 2017 RosemountTM 245 Toroidal Flow Through Conductivity Sensor ...

Page 2: ... 04 This is the initial release of the product manual The manual has been reformatted to reflect the Emerson documentation style and updated to reflect any changes in the product offering B 1 08 Addition of section 1 7 on page 5 C 3 12 Update pages 12 and 16 D 01 14 The manual has been reformatted to reflect the Emerson documentation style and updated to reflect any changes in the product offering...

Page 3: ...ovals that were applicable to the original device Furthermore replacement of original components with those constructed from alternative materials might change the pressure temperature and or performance specifications from those of the original configuration Ensure replacement parts are compatible with process requirements Unauthorized parts and procedures can affect the product s performance pla...

Page 4: ......

Page 5: ...nce Values for RTD 9 2 2 Sensor Wire Resistance Values with InstrumentCable Disconnect 9 List of Figures Sanitary Flow Through Toroidal Conductivity Sensor 2 245 Junction Box withRTD Diagram 4 Sensor to Junction Box Wiring 5 Extension Cable 6 Wiring Extension Cable to 54ec 6 Wiring Extension cable to 1056 and 56 6 Wiring Extension cable to Xmt T Panel Mount 6 Wiring Extension Cable to Xmt T Pipe W...

Page 6: ...Table of Contents Instruction Manual June 2017 LIQ MAN 245 This page left blank intentionally ...

Page 7: ...e compliant with USP Class VI requirements The 245 sensor is easy to install It clamps into the process piping between two Tri Clamp flanges Installation of special grounding rings is not needed because contact rings are already built into the sensor A junction box to facilitate wiring is included Conductivity depends strongly on temperature and conductivity measurements are typically corrected to...

Page 8: ...r supplies the mating flanges clamps gaskets and Pt 1000 RTD Model 245 Sanitary Flow Through Toroidal Conductivity Sensor CODE LINE SIZE Required Selection 01 02 1 03 1 04 2 CODE PROCESS CONNECTION Required Selection 12 Tri Clamp CODE CONTACT RING MATERIAL Required Selection SS 316L Stainless Steel CODE LINER MATERIAL Required Selection PK unfilled PEEK CODE PROCESS O RING MATERIAL Required Select...

Page 9: ...1000 TCmounted in a separate thermowell is also acceptable 2 Thread the RTD wires into junction box Wire the RTD to the j box terminals as indicated in Figure 1 4 Use of optional kit PN 24086 00 is recommended Extension Cable Hook Up 1 Sensor cable should not be run in conduit or open trays with any A C power wiring nor routed near heavy electrical equipment 2 For best sensor instrument loop perfo...

Page 10: ...dard as a function of temperature is known configure the analyzer to measure raw conductivity no temperature correction Also obtain a calibrated thermometer Place the thermometer in a beaker of water next to the sensor DO NOT PUT THE THERMOMETER IN THE SENSOR b If the conductivity of the standard is known only at 25 ºC leave the analyzer slope temperature correction on and set the temperature coef...

Page 11: ... the external toroids during service It does not detect changes in the contact rings It is not a calibration 1 Empty and dry the sensor 2 Attach a resistance decade box to the two yellow wires See Figure 2 1 3 Configure the analyzer to measure raw conductivity no temperature compensation 4 Adjust the resistance until the analyzer display reads the same number it did during calibration Record the r...

Page 12: ...uction Manual June 2017 LIQ MAN 245 Figure 1 4 Extension Cable Figure1 5 Wiring extension cable to 54ec Figure1 6 Wiring extension cable for 1056 and 56 Figure1 7 Wiring extension cable to Xmt T Panel Mount 6 245Sensor ...

Page 13: ...SE RTD IN SHLD RCV A RSHLD DRV B DRV A DSHLD 1 8 Maintenance The only routine maintenance required during the operational life of the sensor is to ensure that there are no deposits plugging the sensor or coating the inside of the contact rings Some customers find it advantageous to periodically replace process Tri Clamp gaskets to ensure adequate process seals Rebuilding the sensor must be done at...

Page 14: ...245 Sensor Instruction Manual June 2017 LIQ MAN 245 This page left blank intentionally 8 245Sensor ...

Page 15: ... sensor for open connections and short circuits Be sure to disconnect the cable PN 23909 00 before checking See Table 2 2 and Figure 2 1 Table 2 1 Resistance Values for Pt 100 and Pt 1000 RTDs Temperature Resistance Ohms C F Pt 100 Pt 1000 18 64 4 106 9 1069 19 66 2 107 3 1073 20 68 0 107 7 1077 21 69 8 108 1 1081 22 71 6 108 4 1084 23 73 4 108 9 1089 24 75 2 109 2 1092 25 77 0 109 6 1096 26 78 8 ...

Page 16: ...Section Title Instruction Manual June 2017 LIQ MAN 245 Figure 2 1 Sensor Circuit for Troubleshooting 10 Troubleshooting ...

Page 17: ......

Page 18: ...ectric Co Rosemountis a mark of one of the Emerson family of companies All other marks are the property of their respective owners The contents of this publication are presented forinformationpurposes only and while effort has beenmade to ensure their accuracy they are not to be construed as warranties or guarantees express or implied regarding the products or services described herein or their us...

Reviews: