www.nelsonheaters.com
GA-2129 Rev. 11
Sheet 15 of 22
Jul. 2018
OPERATION
After installation and programming is completed, and 120VAC has been applied to TB-1, turn the power
switch to “ON”.
See Figure 1.
For a moment both the red and green L.E.D. bars will light, then the system will start scanning. The green
light bar will always appear under each active circuit, the first scan after powering up or resetting alarms. The
green bars will continue to appear under the circuit number until the thermostat turns the heater off, or a loss
of voltage occurs, or continuity is lost, or amperage drops below the threshold. After the alarm delay time-out,
the red bar will light up and the remote alarm will energize. This alarm condition will continue until the
problem is fixed, and the alarm reset switch is pressed, if the system is in manual reset mode.
Alarm Reset Button
S.O. Number
Panel I.D. No.
Digital Display Window
Alarm Silence Button
CM-1 Panel Enclosure
Figure 13
During normal operation of the system, the cabinet door will not need
to be opened. Therefore, keep the door closed and completely
fastened to protect the electronics from dirt and moisture.
!
WARNING:
Summary of Contents for Nelson CM-1
Page 1: ...CM 1 CIRCUIT MONITORING SYSTEM ...
Page 2: ......
Page 12: ...www nelsonheaters com GA 2129 Rev 11 Sheet 12 of 22 Jul 2018 Figure 12 ...
Page 19: ...www nelsonheaters com GA 2129 Rev 11 Sheet 19 of 22 Jul 2018 FIELD WIRING DIAGRAM ...
Page 20: ...www nelsonheaters com GA 2129 Rev 11 Sheet 20 of 22 Jul 2018 ...
Page 21: ...www nelsonheaters com GA 2129 Rev 11 Sheet 21 of 22 Jul 2018 ...
Page 22: ...www nelsonheaters com GA 2129 Rev 11 Sheet 22 of 22 Jul 2018 NOTES ...
Page 23: ......