Fail
The test result is not within the specification uncertainty limit. Micro Motion
recommends that you immediately repeat the meter verification test. If during
the failed test you had set outputs to
Continue Measurement
, set outputs to
Fault
or
Last Measured Value
instead.
•
If the meter passes the second test, the first result can be ignored.
•
If the meter fails the second test, the flow tubes may be damaged. Use
your process knowledge to determine the possibilities for damage and the
appropriate actions for each. These actions might include removing the
meter from service and physically inspecting the tubes. At minimum, you
should perform a flow validation and a density calibration.
Abort
A problem occurred with the meter verification test (e.g., process instability) or
you stopped the test manually. See
for a list of abort codes, a descript
of each code, and possible actions you can take in response.
Smart Meter Verification abort codes
Table 11-3:
Code
Description
Recommended actions
1
User-initiated abort
None required. Wait 15 seconds before
starting another test.
3
Frequency drift
Ensure that temperature, flow, and density
are stable, and rerun the test.
5
High drive gain
Ensure that flow is stable, minimize en-
trained gas, and rerun the test.
8
Unstable flow
Check factors that could cause process in-
stability, then rerun the test. To maximize
process stability:
•
Maintain a constant fluid pressure and
temperature.
•
Avoid changes to fluid composition,
e.g., two-phase flow or settling.
•
Maintain a constant flow rate.
13
No factory reference data for meter
verification test performed on air
Contact Micro Motion.
14
No factory reference data for meter
verification test performed on water
Contact Micro Motion.
15
No configuration data for meter ver-
ification
Contact Micro Motion.
Other
General abort
Repeat the test. If the test aborts again, con-
tact Micro Motion.
11.2.5
Schedule automatic execution of the Smart Meter
Verification test
You can set up and run a single test at a user-defined future time. You can also set up and
run tests on a regular schedule.
Measurement support
Configuration and Use Manual
183
Summary of Contents for MICRO MOTION 2700
Page 10: ...Getting Started 2 Micro Motion Model 2700 Transmitters with Analog Outputs ...
Page 14: ...Before you begin 6 Micro Motion Model 2700 Transmitters with Analog Outputs ...
Page 26: ...Configuration and commissioning 18 Micro Motion Model 2700 Transmitters with Analog Outputs ...
Page 84: ...Configure process measurement 76 Micro Motion Model 2700 Transmitters with Analog Outputs ...
Page 214: ...Measurement support 206 Micro Motion Model 2700 Transmitters with Analog Outputs ...
Page 258: ...Troubleshooting 250 Micro Motion Model 2700 Transmitters with Analog Outputs ...
Page 354: ...Default values and ranges 346 Micro Motion Model 2700 Transmitters with Analog Outputs ...
Page 373: ......