Installation
13
Liebert
®
APM
™
2.6.1 Optional Cabinets
If the Liebert APM installation includes a Liebert BDC, the UPS must be positioned to allow the
Liebert BDC to be bolted to right side of the Liebert APM (see
The Liebert BDC must be cabled and bolted to the Liebert APM
before
the UPS and bypass cabinet
are moved into their final position. Connect the input wiring to the Liebert BDC ONLY after the units
are connected and positioned.
Battery cabinets may be bolted only to the left side of the Liebert APM; see
Figure 1
Cabinet arrangement
2.7
Optional Seismic Brackets
Optional seismic mounting brackets to anchor the Liebert APM, Liebert BDC™ and battery cabinet
to the floor are available. Refer to
for mounting details.
Liebert
APM
Bypass
Distribution
Cabinet
Bypass
Distribution
Cabinet
Liebert
APM
Battery
Cabinet
Battery
Cabinet
Liebert
APM
Battery
Cabinet
Liebert APM connected only to Liebert BDC
(BDC must be on right side of the Liebert APM)
Liebert APM connected to Liebert BDC and Battery Cabinets
(BDC must be on right side of the Liebert APM)
(Battery Cabinets must be on the left side of the Liebert APM)
ALL UNITS VIEWED FROM ABOVE
Liebert APM connected to Battery Cabinet (Battery Cabinets
must be on the left side of the Liebert APM)