KTM 

RICHARDS FIGURE R382/R384/R392/R394 BALL VALVES

INSTALLATION AND OPERATING INSTRUCTIONS

Installation and operating instructions for:

R382, DN 15 - 50 reduced bore; R384, DN 15 - 50 reduced bore; 

R392, DN 8 - 40 full bore; R394, DN 8 - 40 full bore 

MAINTENANCE

The only routine maintenance required is 
periodical checks and adjustment to the 
stem assembly. Adjustment to the gland 
nut is recommended after the first 5000 and 
10000 cycles; and every 10000 cycles thereafter 
to compensate for the bedding of thrust and 
gland seal and ensure leak free operation.
When tightening the gland nut, do not exceed 
recommended torques, see table overleaf. After 
reaching recommended gland nut torque, back 
off to nearest flat on nut. Bend the lock washer 
over the nut in this position.
When fitting actuators to valves, refer 
to mounting instructions supplied with 
mounting kit.

SAFETY PRECAUTIONS

Whenever a valve is being installed or removed 
from the pipeline, ensure the line is not 
pressurized and any hazardous medium is 
drained away. Slowly cycle the valve several times 
to relieve the cavity area and leave in the open 
position.
Check that the seat and body pressure ratings 
are suitable for the service prior to installation. 
These ratings must not be exceeded.

PIPE COMPATIBILITY

Emerson ball valves are suitable for installation 
into most piping systems. The standard end 
connections are:
• BSPT
• NPT
• Socket weld pipe Sch. 40
• Socket weld O/D tube Sch. 10
• Butt weld pipe Sch. 40
Other end connections are available upon 
request.

STORAGE INSTRUCTIONS

The valves ball, seats and end connections 
should be adequately protected against 
damage.
The protective end covers should not be 
removed until ready for installation.

GENERAL

All valves are bi-directional, controlling flow 
in either direction. They can be installed in any 
position, horizontally or vertically.
Thread tape or sealant is recommended to 
ensure effective sealing. Check that the tape/
sealant is suitable for the service.

INSTALLATION

Prior to leaving the factory each valve is 
pressure tested, and to prevent damage to the 
ball surface and seats protective covers will 
have been fitted. Leave these in place until 
such time as the valve is ready for installation. 
On removal make sure the valve is in the open 
position and free of foreign matter.

When installing valve, follow relevant standards 
and statutory regulations.
Examples:
Local gas fitting regulations, municipal building 
codes or electrical wiring regulations.
a)  Screwed valves: valves should not be 

dismantled prior to fitting, and installed as 
a unit following standard piping practice 
(eg. using thread tape or pipe sealant).

  When screwing the valve to the pipe 

DO NOT OVERTIGHTEN.

b)  Weld valves: follow instructions for weld 

valves (see overleaf).

© 2017 Emerson. All Rights Reserved.

Emerson.com/FinalControl

VCIOM-02975-EN 18/02