Instruction Manual
D200158X012
4194S Controllers
July 2018
29
Figure 4-5. Proportional Band Adjustment and Set Point Beam Details
SET POINT BEAM ASSEMBLY
SET POINT
BEAM SHOE
LINK 3
RELAY NOZZLE
TUBING ASSEMBLY
SET POINT BIAS SPRING
POSITIVE FEEDBACK
TUBING ASSEMBLY
SHOE ADJUSTMENT SCREWS
PROPORTIONAL BAND
ADJUSTMENT KNOB
CAP
E‐RING
RETAINING CLIP
PROPORTIONAL
BAND ADJUSTMENT
SET POINT
PIVOT ASSEMBLY
SET POINT
BEAM ASSEMBLY
SET POINT
BEAM SHOE
NOZZLE
O‐RING
NOZZLE
TUBING
ASSEMBLY
CAP (WITH
O‐RING INSIDE)
TAB
E‐RING
RETAINING
CLIP
FLAPPER
W3452‐1
W3852