Emerson CASH VALVE B Series Installation, Operation And Maintenance Instructions Download Page 2

2

CASH VALVE™

 TYPE B ¼" TO 2" FOR CRYOGENIC SERVICE

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

MAINTENANCE INSTRUCTIONS

CAUTION

Before attempting to replace any spare parts, 
be sure to shut off all pressure connections to 
the valve. With the valve closed however, system 
pressure could still be locked between the shut 
off valve and the inlet and/or outlet sides of the 
regulator. Before proceeding with any valve 
service, be certain to relieve the pressure from 
both sides of the regulator.

Refer to section view for parts identification.  
Repair parts can easily be installed without 
removing the regulator from the line. 

Servicing Diaphragm(s) and Pressure Spring

1.   Loosen the lock nut and turn the adjusting 

screw counterclockwise until the pressure 
spring is no longer under tension. When 
reassembling, run the adjusting screw down 
until the lock nut almost touches the spring 
chamber. This will give you approximately 
the same set as before disassembly.

2.   Remove the assembly screws securing 

the spring chamber to the body. During 
reassembly, tighten the screws evenly 
in a star pattern. See Chart below for 
torque values.

3.   Remove the spring chamber. Then remove 

the spring button, pressure spring, and 
pressure plate.

4.   Remove the diaphragm(s) and diaphragm 

gasket (a diaphragm gasket is only 
present when construction calls for 
metal diaphragms).

5.   Remove the pusher post button. During 

reassembly, ensure the pusher post button 
is centered properly on the pusher post.

6.   Inspect all parts for wear and damage and 

replace if necessary. Reassemble parts 
in reverse order. DO NOT OVERTIGHTEN. 
Follow the Operation Instructions to reset 
the delivery pressure.

Servicing the Cylinder, Piston, 
Strainer Screen, and Plug Gasket

1.  Loosen the lock nut and turn the adjusting 

screw counterclockwise until the pressure 
spring is no longer under tension. When 
reassembling, run the adjusting screw down 
until the lock nut almost touches the spring 
chamber. This will give you approximately 
the same set as before disassembly.

2.  Remove the bottom plug. Take care, as 

the bottom plug is under slight tension as 
a result of the piston spring acting against 
the bottom plug. Remove the piston, piston 
spring, and strainer screen.

3.  Thoroughly clean the strainer screen and 

remove any debris from the valve body.

4.  Remove the hexagon cylinder.
5.  Inspect all parts for wear and damage. If 

either the cylinder or piston need replacing, 
it is necessary to replace both as both parts 
wear equally.

6.  Reassemble the valve in reverse order. DO 

NOT OVERTIGHTEN. Follow the Operation 
Instructions to reset the delivery pressure.

Valve Size, In. (mm)

Assembly Screw Torque Value, In-lbs (N•m)

1

/

4

 (6.35)

100 (11.3)

3

/

8

 (9.53)

150 (16.9)

1

/

2

 (12.7)

200 (22.6)

3

/

4

 (19.1)

200 (22.6)

1 (25.4)

250 (28.2)

1

 

1

/

4

 (31.8)

350 (39.5)

1

 

1

/

2

 (38.1)

350 (39.5)

2 (50.8)

350 (39.5)

OPERATING INSTRUCTIONS

Adjusting the Delivery Pressure

The regulator’s delivery pressure setting is 
adjusted by turning the adjusting screw (1) 
at the top of the spring chamber (5) after 
loosening the adjusting screw lock nut (2). 
To increase the delivery pressure, turn the 
adjusting screw clockwise (into the spring 
chamber). To decrease the delivery pressure, 
turn the adjusting screw counter-clockwise 
(out of the spring chamber). Tighten the 
adjusting screw lock nut after the adjustment 
has been made.

Reviews: