Figure 3-1: Spot face or end mill tool
Attachment tools and supplies
•
1/4-28" taps and tap handle
•
9/16" open-end wrench
•
1/8" hex Allen key
•
3/16" ball-end hex wrench
•
Wire brush
•
Plant-approved cleaner/degreaser
•
Plant-approved semi-permanent thread locker (e.g. Loctite)
For epoxy mount, you also need the following:
•
2-part epoxy
•
A212 Mounting Pads
Figure 3-2: A212 mounting pad
•
(Optional) Grinder – to create a sufficiently flat mounting surface
For motor fin mount, you also need the following:
•
Motor Fin Mount Probe
•
Epoxy
3.3
Mounting mechanisms
The device may be mounted using any of the mechanisms listed below. Stud mounting is
preferred. The mounts are listed according to our recommendation. Temporary mounting
should be a last resort.
•
Stud mounting (preferred)
Installation
User Guide
August 2020
MHM-97927-PBF
44
MHM-97927-PBF, Rev 1
Summary of Contents for AMS Wireless Vibration Monitor
Page 1: ...User Guide MHM 97927 PBF Rev 1 August 2020 AMS Wireless Vibration Monitor User Guide ...
Page 42: ...Configuration User Guide August 2020 MHM 97927 PBF 42 MHM 97927 PBF Rev 1 ...
Page 50: ...Installation User Guide August 2020 MHM 97927 PBF 50 MHM 97927 PBF Rev 1 ...
Page 80: ...Product certifications User Guide August 2020 MHM 97927 PBF 80 MHM 97927 PBF Rev 1 ...
Page 82: ...Third party licenses User Guide August 2020 MHM 97927 PBF 82 MHM 97927 PBF Rev 1 ...
Page 85: ...User Guide MHM 97927 PBF August 2020 MHM 97927 PBF Rev 1 85 ...