Power up
41
Power up
Before you power up
1. Ensure that the switches for SPS A
and SPS B
are turned Off as shown in
.
2. Ensure that the cabinet circuit breakers are in the On position, all necessary PDU switches are
switched On, and power is connected.
Connecting or verifying power cables
1. Connect or verify the power cables as shown in
. Ensure that all the
power cables are locked in place.
Note: Only storage processors should be connected to the SPS.
a. SPS B to PDU B.
b. SPS B to SP B.
c. SPS A to PDU A.
d. SPS A to SP A.
e. CS0 to PDU B.
Note: The LEDs begin flashing.
f. Blade enclosure 0 to PDU B.
g. Blade enclosure 0 to PDU A.
h. Blade enclosure 1 to PDU B
i. Blade enclosure 1 to PDU A
2. Turn on the SPS power switches.
3. Wait 15 minutes for the system to power up completely.
4. If the optional CS1 is installed, wait until Step 3 completes and the SP fault LED is turned off,
then connect CS1 to PDU A.
K
J
A
B
C
D
E
F
G
H
I
J
K
L
Summary of Contents for VNX5500
Page 1: ...EMC VNX VNX5500 File Installation Guide P N 300 012 926 REV 05...
Page 14: ...14 EMC VNX5500 File Installation Guide...
Page 26: ...26 EMC VNX5500 File Installation Guide...
Page 58: ...58 EMC VNX5500 File Installation Guide...
Page 64: ...64 EMC VNX5500 File Installation Guide...
Page 70: ...70 EMC VNX5500 File Installation Guide Planning Worksheets...
Page 71: ......
Page 72: ......