11
Install components, latches, and bezels
1. Starting with the bottom component fi rst, install each component.
2. Fully tighten the retention screws and ensure that each component is installed securely.
3. Install the needed latches, as you install the components.
4. After all the components and latches are in place, snap on the bezels.
For more information, refer to Celerra Tools on http://Powerlink.EMC.com
2 screws per side
Front
A and B sides
bezel bracket
Disk-array enclosure (DAE)
2 bracket screws each side
Install the bottom component first.
Ensure that each component
is secure before you install the
component above it.
1
2
3
4
5
CNS-001461MOD NEW
Rail catch
1 screw per side
Control Station (CS)
Standby power supply (SPS)
Storage processor (SP)
Front
Snap on bezels
Press to install the bezel,
then release.
Press
The indentation goes
toward the inside of
the rack.
Install the lower
screw first with 2 screws
on each side.
Right front side
Inside
Blade enclosure
1U latch, 2 screws each side
Inside
Summary of Contents for CelerraNS-120
Page 1: ...EMC Celerra NS 120 System Single Blade Installation Guide P N 300 007 880 Rev A04...
Page 30: ...30 EMC Celerra NS 120 system notes...
Page 35: ......
Page 36: ......