emaux CLL Series Manual Download Page 2

1
2
3

4

5

6

7

8

9

10

11

2)  Before  replacing  O-ring  make  sure  the  all  liquid  has  been 

discharged (by removing the bottom drain 

plug).

3)  Replace  the  o-ring  and  lubricate  the  surface  of  the 

o-ring before closing the Lid.

4) Fasten the bottom drain plug.
5) Follow the steps under “CLOSING THE FEEDER LID”.

Warning:

 

WINTERIZING

When cold weather is forthcoming, drain all water in the feeder by loosening the Bottom Drain 
Plug.  Open  the  feeder  lid  and  with  chemical  resistant  gloves  on  carefully  take  out  the 
undissolved tablets and rinse the feeder thoroughly with water then put the cover back.

INSTALLATION

Always install the chlorine feeder after the heater. If there is no heater, install after the filter.
Position  the  chlorinator  on  level  surface  as  close  to  the  filter  and  pump  as  possible.  The 
preferred  installation  is  above  water  level  and  below  filter  or  heater  outlet  (Figure  1);  or  is 
offline  with  feeder  inlet  connecting  to  the  pump  outlet  and  feeder  outlet  behind  the  heater 
outlet. 
An inline positive seal corrosion-resistant check valve is to be installed to reduce backflow of 
chlorine gas when the system is shut off and to control the follow of water to the feeder. If  the 
chlorine feeder must be located below water level, a check valve is needed to prevent water 
backflow when opening the unit as well as to control the flow of water.
The  CLL  series  feeders  feature  with  two  inlets,  either    one  can  be  chosen  to  meet  the 
installation requirements and seal the other with the supplied plug and PVC glue.

Note: After installation start up the system to perform leakage check, re-tighten if required. This 
installation  can  only  apply  to  imperial/metric  1.5”  pipes.  The  feeder  can  be  fixed  onto  the 
installation surface by tapping screws and 4 securing holes in its base.

DO  NOT  use  petroleum  type  of  lubricants  on  the 

O-ring. Silicone Grease is recommended.

2

VALVE

(

NOT

INCLUDED)

CHECK VALVE

FROM
POOL

FILTER

PUMP

HEATER

INLET 

FEEDER

RETURN 

TO POOL

Figure 1

CLL-50 / CLL-75 PART LIST

Item

Part No.

Description

Qty

1

89440309 Drain Plug with O-Ring

1

2

89440313

Connector for Pressure Gauge/Stopper 
with O-Ring (Viton)

1

3

89440310 Air Release Valve with O-Ring

1

4

01021006 Ring Lock for Cartridge Filter

1

5

01011020 Lid

1

6

02080003 O-Ring for Lid

1

7

89440301 CLL-50 Diffuser Assembly

1

7

89440302 CLL-75 Diffuser Assembly

1

8

89440311 1.5" Union

2

9

89440303 CLL-50 Feeder Body

1

9

89440304 CLL-75 Feeder Body

1

10

01011015 Plug

1

11

89440312 Air/Water Release Valve with O'Ring

1

Reviews: