1
EMFE20010902
EMAUX CLL Series Automatic Chlorine Feeder
Keep the manual for future reference
EMAUX CLL series automatic chlorine feeder is designed to be used side
by side with your filtration system. The feeder is driven by the pressure
difference between its outlet and inlet which pushes water through it. It
uses slow-dissolve Trichloro-S-Triazinetrione (Tri-Chlor) large or small tablets
(or sticks) only. You should NEVER use other type of chemical. CLL50
can hold up to 6kg of tablets while CLL75 can hold up to 11kg. Such
capacity should be able to provide 3 to 6 weeks’ chlorination for large
pools. The feeder has a true union ball valve to adjust the flow rate
through itself, by regulating the valve setting and the amount of Tri-Chlor tablets placed in the feeder, the
chlorine feed rate needed to maintain the proper chlorine level of your pool can be readily tuned.
READ CAREFULLY AND KEEP THE MANUAL FOR FUTURE REFERENCE.
WARNING:
This feeder can ONLY be used with slow-dissolving Tri-Chlor. DO NOT mix with other type of chlorine or
chemicals, otherwise it may cause explosion or fire.
Great care must be taken while opening the feeder. Always switch off pump and close all available valves
before opening. Do not inhale fume from any chemical feeder or container.
Always protect your eyes, skin and clothing from any chemical.
DO NOT open a feeder while the pump is running.
To prevent gas from building up in the feeder, make sure the pool return line valve is kept open except
when opening or servicing. Always read the labels, warning information and closely follow chlorine
manufacturer's and or dealer's recommendation for proper conditioning and daily chlorine requirements for
your particular pool and area.
DIRECTIONS FOR USE
Before starting up your chlorine feeder your pool/spa should be properly conditioned with a chlorine level
of 1.0 to 1.5ppm. Directions and instructions from dealer chemical manufacturer and dealer should be
followed.
The chlorine demand for pools and spas varies according to load, usage, temperature, sunlight etc. Initially
you should experiment to determine the proper amount of chlorine and the correct check valve setting
required for our pool and filter time cycle. Check chlorine residual daily and adjust the dial valve for more or
less chlorine. Increasing the quantity of chlorine in your feeder with extend the recharging circle.
OPENING THE FEEDER LID
1) Turn off the pump and close off inline check valve if any to prevent backflow; unscrew Air Release Valve
on the Lid and wait for 1 minute.
2) Turn the Ring Lock of the Lid anti-clockwise to open the Lid.
Caution: DO NOT inhale the gas from the feeder.
CLOSING THE FEEDER LID
1) Ensure the o-ring a proper placed to the Lid, align the Lid to the Cartridge Filter Body.
2) Engage thread with the Ring Lock and turn clockwise to tighten.
3) Tighten Air Release Valve.
4) Set the check valve (not included) to the desire position then open inlet valve (if available).
5) Restart pump.
VACUUMING
Close check valve (not included) to avoid bypass of sediment and possible clogging of control valve when
Vacuuming.
CHANGE O-RING
1) The steps under "OPENING THE FEEDER LID".
CLL-50
CLL-75
80g
印尼蓝
普通印刷
2020.01
1 : 1
148X210(mm)
PANTONE Process Black C
材
料
工 艺
日 期
EMAUX CLL
系列投药器 英文说明书
EMFE20010902
名 称
版 本 编 号
规 格
比 例
颜 色
产品负责人
更改日期
更改内容
文字
版本
制图/设计
E
意 万 仕(中
山)泳
池 设 备 有 限 公 司
E M A U X ( Z h o n g S h a n ) S w i m m i n g P o o l E q u i p m e n t C o . , L t d
审核
批准