Installation Guide
Flatpack2 -48V 150A
~ 2029242 R2, May 2008
3
Table of Contents
1.
Safety and Compliance................................................................... 5
FCC Compliance Statement.............................................................................................5
2.
Introduction .................................................................................... 7
About This Guide ................................................................................................................7
About This Revision (2) .....................................................................................................7
3.
Mechanical Installation................................................................... 8
System Unpacking.............................................................................................................8
Rack Mounting ....................................................................................................................8
Rack Installation................................................................................................................... 8
Anchor the Cabinet............................................................................................................9
Equipment Rack “Frame Ground”...................................................................................... 9
Converter Shelf Installation.............................................................................................9
4.
Electrical Installation.................................................................... 10
Individual Feed ................................................................................................................. 11
Dual Feed .......................................................................................................................... 11
5.
Module Installation ....................................................................... 12
6.
Distribution ................................................................................... 13
LVD Options...................................................................................................................... 14
Central Office Ground .................................................................................................... 14
Configurations ................................................................................................................. 15
Two Battery, Two Load (2B 2L).......................................................................................15
Two Battery, Two Load, 12 GMT (2B 2L GMT) .............................................................16
Two Battery, Four Load (2B 4L).......................................................................................16
Four Load, 12 GMT (4L GMT) ............................................................................................17
Six Load (6L) ........................................................................................................................17
Breakers and Fuses ........................................................................................................ 18
Plug-in Breakers .................................................................................................................18
Plug-in Fuse Holders..........................................................................................................18
GMT Fuses ...........................................................................................................................20
Battery Connections ...................................................................................................... 20
Load Connections ........................................................................................................... 21
7.
Alarm and Control Terminations .................................................. 22
Alarm Contacts................................................................................................................ 22
Configurable Inputs ........................................................................................................ 23
Temperature Probe Terminations ............................................................................... 23
Symmetry Terminations................................................................................................ 24