
Þ
When adding or removing devices to or from the system, ensure
that the power cables for the devices are unplugged before the
signal cables are connected. If possible, disconnect all power
cables from the existing system before you add device.
Þ
Before connecting or removing signals cables from motherboard,
ensure that all power cables are unplugged.
Þ
Make sure that your power supply is set to the correct voltage in
your area. If you are not sure about the voltage of the electrical
outlet you are using, contact your local power company.
Þ
If the power supply is broken, do not try to fix it by yourself.
Contact a qualified service technician or your retailer.
Operation safety
Þ
Before installing the motherboard and adding devices on it,
carefully read the manuals that came with the package.
Þ
Before using the product, make sure all cables are correctly
connected and the power cables are not damaged. If you detect
any damage, contact your dealer immediately.
Þ
To avoid short circuits, keep paper clips, screws, and staples away
from connectors, slots sockets and circuitry.
Þ
Avoid dust, humidity, and temperature extremes. Do not place the
product in any area where it may become wet.
Þ
Place the product on a stable surface.
Þ
If you encounter technical problems with the product, contact a
qualified service technician or your retailer.
EMC Rules
This unit has to be installed in a shielded housing. If not installed in a
properly shielded enclosure, and used in accordance with the
instruction manual, this product may cause radio interference in which
case the user may be required to take adequate measures at his or her
own expense
.
Summary of Contents for BAB 740
Page 1: ...BAB 740 Basic Automation Board with PowerPC 740 manual Revision 2C...
Page 11: ...User s Manual Table of Contents BAB 740 V 7 1 9 PCI IDSEL 7 9 7 2 Factory settable Jumpers 7 9...
Page 16: ...Table of Contents User s Manual BAB 740 X...
Page 22: ...Specification Specification User s Manual BAB 740 1 6...
Page 42: ...Connector Assignments User s Manual BAB 740 3 16 Connector Assignments...
Page 50: ...Board Parameters Board Parameters User s Manual BAB 740 4 8...
Page 60: ...Booting Booting User s Manual BAB 740 6 4...
Page 74: ...NOTES...