background image

EA_Gatekeeper model 2210 Ethernet backhaul

10

DISCLAIMER OF WARRANTIES AND LIMITATIONS OF LIABILITY

There are no understandings, agreements, representations, or warranties either express or implied, including warranties of merchantability or fitness
for a particular purpose, other than those specifically set out by any existing contract between the parties. Any such contract states the entire
obligation of the seller. The contents of this document shall not become part of or modify any prior existing agreement, commitment, or relationship.

The information, recommendations, descriptions, and safety notices in this document are based on Elster Solutions, LLC experience and judgment
with respect to operation and maintenance of the described product. This information should not be considered as all-inclusive or covering all
contingencies. If further information is required, Elster Solutions, LLC should be consulted.

No warranties, either expressed or implied, including warranties of fitness for a particular purpose or merchantability, or warranties arising from the
course of dealing or usage of trade, are made regarding the information, recommendations, descriptions, warnings, and cautions contained herein.

In no event will Elster Solutions, LLC be responsible to the user in contract, in tort (including negligence), strict liability or otherwise for any special,
indirect, incidental, or consequential damage or loss whatsoever, including but not limited to: damage or loss of use of equipment, cost of capital,
loss of profits or revenues, or claims against the user by its customers resulting from the use of the information, recommendations, descriptions, and
safety notices contained herein.

© 2016 by Elster. All rights reserved. Produced in the United States.

Elster Solutions

Raleigh, North Carolina
Technical support: 800 338 5251

Notes:

Summary of Contents for EnergyAxis Gatekeeper 2210

Page 1: ...keeper can be enclosure mounted in different form factors This leaflet explains how to install the gatekeeper model 2210 This model of EA_Gatekeeper is configured for 120 VAC to 277 VAC nominal operation and uses a battery backup for gatekeeper operation if AC power fails at the site The EA_Gatekeeper model 2210 uses a NEMA 4X rated polycarbonate enclosure The gatekeeper supports different mountin...

Page 2: ...er supply Pb battery charger 6 7 Heater power terminals 8 Heater fuse 9 Thermostat 10 AC power fuses 11 Surge protective device 12 Heater 13 LAN RF filter 14 Enclosure latches lockable 15 Metal enclosure vent 16 3rd party WAN antenna hole plugs 17 Universal mounting bracket 18 LAN antenna Must be field configured May be bulkhead for remote antenna 19 PE ground lug 20 AC cable entry gland 19 19 18 ...

Page 3: ...lass A compliance statement on page 9 For optimal performance of the LAN antenna Honeywell recommends that the EA_Gatekeeper model 2210 be installed so that the enclosure is at least 5 feet 1 5 meters off the ground Failure to meet the minimum ground clearance can result in degraded performance of the EA_Gatekeeper model 2210 communication within the EnergyAxis or Connexo systems The EA_Gatekeeper...

Page 4: ...ratures are below freezing first gently warm the enclosure around the lid gasket to ensure the gasket is not frozen to the sealing surface LAN communications The gatekeeper supports different antenna options If the antenna is mounted on the unit itself that is a local external antenna no additional steps are required when placing the gatekeeper into service If the gatekeeper is to be installed at ...

Page 5: ...ernal Ethernet surge suppressor The external Ethernet device cable is routed through the Ethernet cable gland and connected into the bottom of the Ethernet surge suppressor The cable used must be rated for outdoor use have a minimum CAT 5 rating and have EMI RFI shielding with conductive RJ 45 connectors The cable shielding is connected to ground on the EA_Gatekeeper side and should be left ungrou...

Page 6: ...ction instructions 120 VAC Figure 3 Connect heater wire 23 to thermostat flag terminal D Using jumper Z connect heater wire 22 and 24 to DIN rail position B Torque the DIN rail terminal screw to 5 inch pounds 0 565 Newton meters 240 277 VAC Figure 4 Heater wire 22 connects to thermostat flag terminal D Heater wire 23 connects to DIN rail terminal C Use jumper Y to make this connection Torque the D...

Page 7: ...he enclosure 5 If you are using a remote antenna option mount the external antenna and route the cable through the lightning arrestor bulkhead 18 Use coax sealant to waterproof these connections 6 Apply AC power as appropriate for the intended AC power operation Power is applied to the gatekeeper by a cable that enters the enclosure through the base of the unit 20 and connects to the AC line SPD 1...

Page 8: ...m battery power Off Normal operation AC power is present at the DC power supply battery charger Low battery or battery replacement On With AC power absent this indicates the operational backup battery 3 is critically low and on the verge of failure With AC power present the battery fuse might be faulty or the battery requires service Off Normal operation Battery is within normal parameters and con...

Page 9: ...nnas located within 20 cm of each other within a final product is not allowed Trademark notices EnergyAxis is a trademark and or registered trademark of Elster Other names may be trademarks and or registered trademarks of their respective owners FCC and Industry Canada Compliance User Information Part 15 105 This equipment has been tested and found to comply with the limits for a Class B digital d...

Page 10: ...covering all contingencies If further information is required Elster Solutions LLC should be consulted No warranties either expressed or implied including warranties of fitness for a particular purpose or merchantability or warranties arising from the course of dealing or usage of trade are made regarding the information recommendations descriptions warnings and cautions contained herein In no eve...

Reviews: