Elsner KNX L Technical Specifications And Installation Instructions Download Page 5

5

Installation and commissioning

KNX L brightness sensor

 • Date of issue: 05.11.2010 • Technical changes reserved. Errors reserved.

Fasten the mount vertically onto the wall or pole. 

Fig. 1
When wall mounting: flat side on wall, crescent-
shaped collar upward.

Collar

Fig. 2
When pole mounting: curved side on pole, collar 
downward.

Collar

Fig. 3
An additional, optional accessory available from 
Elsner Elektronik is an articulated arm for flexib-
le wall, pole or beam mounting of the sensor.

Fig. 4
Example uses of the hinge arm mounting: With 
the hinge arm mounting, the sensor peeps out 
from beneath the roof overhang. 

Summary of Contents for KNX L

Page 1: ...ifications and installation instructions EN Elsner Elektronik GmbH Control and Automation Engineering Herdweg 7 D 75391 Gechingen Phone 49 0 70 56 93 97 0 info elsner elektronik de Germany Fax 49 0 70...

Page 2: ...OR logic gates with each 4 inputs Every switching incident as well as 8 logic inputs in the form of communication objects may be used as inputs for the logic gates The output of each gate may optional...

Page 3: ...t by a competent electrician Disconnect all lines to be assembled and take safety precautions against accidental switch on The device is exclusively intended for appropriate use With each inappropriat...

Page 4: ...may be collected by the sensors unobstructedly The sensor may not be shaded by the building or for example by trees 2 3 Mounting the sensor 2 3 1 Attaching the mount The sensor comes with a combinati...

Page 5: ...g flat side on wall crescent shaped collar upward Collar Fig 2 When pole mounting curved side on pole collar downward Collar Fig 3 An additional optional accessory available from Elsner Elektronik is...

Page 6: ...reserved Errors reserved 2 3 2 View of rear side and drill hole plan Fig 5 Example uses of the hinge arm mounting Fit ting to a pole with worm drive hose clips Langloch 7 5 x 5 mm Fig 6 a b Drill hol...

Page 7: ...ction cable through the rubber seal on the bottom of the sensor and connect bus to the provided clamps 2 3 4 PCB layout 2 3 5 Mounting the sensor Close the housing by putting the cover back over the b...

Page 8: ...nitialisation phase las ting 5 seconds During this phase no information can be received via the bus 3 Maintenance The sensor must regularly be checked for dirt twice a year and cleaned if necessary In...

Reviews: