background image

4

Installing and commissioning

IP KNX interface

 • Version: 13.03.2017 • Technical changes and errors excepted.

2.2. Setting up and connecting the device

2.3. Instructions for assembly and initial start-up

Never expose the device to water (e.g. rain). This can damage the electronics. A relative 
air humidity of 90% must not be exceeded. Avoid condensation.

After the operating voltage has been applied, the device will enter an initialisation pha-
se lasting a few seconds. During this phase no information can be received or sent via 
the bus.

Fig. 1
Series installation on the mounting rail (3 

TE)

1) IP connector
2

Programming LED and programming 
buttons (PRG)

3) Bus terminal slot (KNX +/-)
4) Power LED (supply voltage/Bus)

3

4

1

2

Reviews: