4
Installing and commissioning
IP KNX interface
• Version: 13.03.2017 • Technical changes and errors excepted.
2.2. Setting up and connecting the device
2.3. Instructions for assembly and initial start-up
Never expose the device to water (e.g. rain). This can damage the electronics. A relative
air humidity of 90% must not be exceeded. Avoid condensation.
After the operating voltage has been applied, the device will enter an initialisation pha-
se lasting a few seconds. During this phase no information can be received or sent via
the bus.
Fig. 1
Series installation on the mounting rail (3
TE)
1) IP connector
2
Programming LED and programming
buttons (PRG)
3) Bus terminal slot (KNX +/-)
4) Power LED (supply voltage/Bus)
3
4
1
2