7
Installation and Commissioning
KNX I4-ERD evaluation unit
• Status: 15.03.2016 • Technical Changes and Errors reserved.
After the bus voltage has been applied, the device will enter an initialisation phase last-
ing a few seconds. During this phase no information can be received or sent via the
bus.