© Copyright 2021 Elo Touch Solutions, Inc.
8
Apply double-sided foam tape from bag “U” to back of Slate Hub and attach to back of head approximately
where shown. Route LAN cable through base. Connect LAN and power supply to Slate Hub.
12
Skip to step
25