Elnur CM15BG Installation Instructions And User Manual Download Page 21

 

Nom

Man

 
Dire

Man

 

 
Decl

 

Decla

 

 

Marc

Trad

 

Mod

Mod

 

ha si
todo

 

has b
respe

Segu

Safet

 
 

EMC

 

 
 
 

Infor

Addit

 
El pro
Direc

Cualq
invali

The p
EMC 

Any u
confo

 
 
Alget

Place
 
 

 

mbre del fab

ufacturer’sn

ección del fa

ufacturer’s 

lara que el 

 

 

ares, that th

 

 

ca : 

deMark :   

elos : 

dels :

 

do fabricad

o las Norma

been manuf

ects to the r

uridad :

 

ty : 

C :

 

rmación ad

tionalinform

oducto aquí 

ctiva de EMC

quier uso qu

darán esta d

product herew

Directive 200

use not accord

rmity. 

te, 31 de Ago

, Date 

bricante :

 

name :

 

abricante :

 

address :

 

producto :

 

he product 

 

 

do conform

as vigentes

factured to t

relevant sta

EN 

EN 
EN 

EN 
EN 

EN 
EN 

dicional : 

mation : 

citado se ha

C 2004/108/C

e no esté de
eclaración d

with complies 

04/108/EC an

ding to the ins

osto de 2015

DEC

D

 

EL

 

EL

 

P.

 

28

   

C

 

C

:  

C

 

C

 

G

 

C

 

me a las esp

s, en particu

the technic

andards and

 

60335-1:201

60335-2-35:
50106:2008

55014-1:200
55014-2:199

61000-3-2:2
61000-3-3:2

lla en confor

CE y lleva el 

e acuerdo co

e conformid

with the requ

nd carries the

structions and

 

2

CLARACI

De acuerdo 

DECLARAT

According to 

LNUR, S.A.

LNUR, S.A.
.I. El Nogal. V

8110 Algete,

Caldera modu

Caldera modu

CMBG” Heat

CMXBG” Hea

GABARRÓN

CM15BG, CM

pecificacion

ular: 

al specifica

d regulations

12+A11:2014

2002+A1:20

06+A1:2009+
97+A1:2001+

2006+A1:200
2008 

rmidad con l

marcado CE

on las instruc

dad. 

uirements of t

e CE mark.

 

d/or any chang

ON DE C

con la norma IS

TION OF C

the Standard IS

Villa Esther, 

, Madrid, Spa

ulante digital 

ulante digital 

ting digital mo

ating and D.H

MX15BG 

 

nes técnicas

tions of the

s in force an

007+A2:2011

+A2:2011 
+A2:2008 

09+A2:2009

a Directiva d

E. 

cciones y/o c

the Low Voltag

ge to the app

CONFORM

SO / IEC 17050

CONFORM

SO / IEC 17050-

11 

ain 

sólo calefac

de calefacci

odulating boile

H.W. digital m

s del produ

e product an

nd especiall

 

de Baja Tens

ualquier cam

ge Directive 2

pliance will inv

MIDAD

 

0-1 

MITY

 

-1 

Nº 

ción “CMBG

ón y A.C.S. “

er 

modulating bo

ucto y cump

nd conforms

ly to : 

sión 2006/95

mbio al apara

2006/95/EC a

validate this d

Alberto 

Directo

EL

6610000 and 66

G” 

“CMXBG”

 

oiler

 

ple en 

s in all 

/CE y la 

ato 

and the 

declaration of 

Fernández

or Gerente

LNUR, S.A.

620000 

f

Summary of Contents for CM15BG

Page 1: ...must be followed for the safe installation of the boiler Any problem fault or damage caused by the non observance ofthese instructions will not be covered under the manufacturer s warranty This manual...

Page 2: ...rved and given to any new user The symbols used in the text are explained below WARNING This indication shows the possibility of causing death from electric shock WARNING This indication shows the pos...

Page 3: ...he hot water supply to ensure a safe and economic supply of hot water All components for sealed system central heating are built in A suitable filling loop should be fitted externally to comply with w...

Page 4: ...nts before commencing SITING THE BOILER WARNINGWall and fixings must be suitable to support the total weight CMX boiler when full is 120 kg CM boiler when full is 50 kg Allow sufficient clearance and...

Page 5: ...current building regulations Installation should also be in accordance with the relevant British Standards and Codes of Practice including the following BS 5449 Forced circulation hot water systems BS...

Page 6: ...r splashing onto the boiler or controls Electrical safety regulations for clearances must be followed if installed in a bathroom or shower area The boiler has an electric protection rating of IP20 IP2...

Page 7: ...to enable easy access for servicing Ensure sufficient space to make all water connections including the outlet pipes for the heating and hot water safety valves which should be routed to a suitable d...

Page 8: ...able caps Heating Flow Return These connections are for connection to 22mm pipe using the tails provided Service valves should be installed at this position to allow the boiler to be isolated for main...

Page 9: ...d with a continuous fall to a safe yet visible point where any discharge cannot cause damage or injury 4 8 DHW DISCHARGE PIPE WORK The CMX electric combi boiler range incorporates a 50 L unvented hot...

Page 10: ...ection to Mains Supply The CM15BG and CMX15BG boilers must be installed in premises having a system impedance of not more than 0 25 j0 25 The CM15BG and CMX15BG boilers comply with the technical requi...

Page 11: ...the connection block as shown The terminal connection block is at the rear right hand side of the boiler and is accessed after removing the boiler front panel The supply cable should be safely routed...

Page 12: ...ing from t oned upside d the switches t hree phase su elected output ED HEAT OU ial to confirm f electronic card 1 mum heat outp NS WHERE TH L MUST BE RE also be limited best hot wate mum but will s p...

Page 13: ...remains in the system or there is insufficient pressure or flow rate the boiler will fail to operate and display fault E3 A LED indicator informs about the operating status of the pump Green correct...

Page 14: ...SWITC GE COULD O gene on th Turn of th Main switc i temperatu nd other essages Red dot shows heating heating lements on duty 3 ghly prior to BS7593 BS54 boiler Any cle efully followed RESSURE REL T O...

Page 15: ...ay o DHW produ W and the elem desired tempe rature can be t the setting t s or instantly between 20 a ver the centra m temperatur D n 1 The same but he butto y will show th uction over ce ments are en...

Page 16: ...n fo er will be lock will function n e same button there is a fail ON l automatically activity The p 1 as room therm button Pushin ay will show th e of the water o adjust the v w seconds or C and 85 C...

Page 17: ...3 Fault E3 continued System resistance too high or blockage Check pump speed 3 Check pump duty sect 4 9 Open all radiator valves Install system by pass Fault E5 displayed Error in configuration for ma...

Page 18: ...ect the bo dition are he heating sys Check as sho m debris or a y restrictions s ostatic In th the boiler dur ever the guida g of an automa inimum flow r asteful circula OUTPUT actual heat po that mom...

Page 19: ...most rigorous environmental requirements For example the selection of materials involves guaranteeing their biodegradability re use and recycling When this boiler s long useful life is over it must b...

Page 20: ...3kW A 13 0 13 0 DHW available time with 15kW min 5 49 DHW available time with 13kW min 6 42 DHW available time with 12kW min 7 16 DHW available time with 11kW min 7 56 DHW available time with 10kW min...

Page 21: ...arries the structions and 5 2 CLARACI De acuerdo DECLARAT According to LNUR S A LNUR S A I El Nogal V 8110 Algete Caldera modu Caldera modu CMBG Heat CMXBG Hea GABARR N CM15BG CM pecificacion ular al...

Page 22: ...21 NOTES...

Page 23: ...22 13 WIRING DIAGRAMS...

Page 24: ...ufact ELNU Traves a de V 28110 Alge Telephone 3 ement the man dicates that this e collection po osed of corre ealth which co cycling of this p hased the prod plier UK Ltd 0 1942 67011 nur co uk nur co...

Reviews: