Elko CRM-100 Manual Download Page 2

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

SET ADJ

5:39

F

H M



5:39

f

H M



5:39

f

H M



5:39

f

H M



8:39

f

H M



8:39

f

H M



8:09

f

H M



8:09

f

H M



8:06

f

H M



8:06

f

H M



8:06

f

H M

00.0

8:06

f

H M

0

T

T

U

R

1

T

OFF

T

ON

T

OFF

T

ON

U

R

2

T

OFF

T

ON

T

OFF

T

ON

U

R

3

T

T

U

R

4

t1

T + t1 + t2

t2

T

U

B1

R

5

t1

T + t1 + t2

t2

T

U

B1

R

6

t1

T + t1 + t2

t2

T

U

B1

R

7

U

B1

R

8

U

B1

R

9

U

B1

R

A

U

B1

R

B

U

B1

R

B

U

B1

R

C

U

B1

R

T T 

D

U

B1

R

E

U

B1

R

F

U

B1

R

G

OFF

U

B1

R

T

ON

 

2 / 3

Function

ON delay

 [

0

]

Timing commences when supply is present. R energizes at 
the end of the timing period.

Programming instruction

Apply power & hold the SET key for > 3 sec.

Press both ADJ & SET  key for  > 3 sec. After power ON.
Now follow the steps given below

OR

KEY

DISPLAY

RESULT

Press ADJ key to select desired function (e.g. F)

Confi rms function Then Range indicator blinks

Press ADJ key to select range (e.g. HM range ‘HM‘)

Confi rms range selection. 1st digit of Preset time blinks. 
(For modes ‘1’ , ‘2’ & ‘G’ two preset times ‘On’ & ‘Off ’ to 
be set)

Change with ADJ Key (e.g.from 3 to 0)

Press Set to confi rm 1st digit selection, now 2nd digit 
blinks

Press ADJ key to adjust desired preset time digit (e.g.from 
5 to 8)

Confi rms 2nd digit selection, now 3rd digit of Preset Time 
blinks.

Change with ADJ Key (e.g. from 9 to 6)

Now UP / DOWN Indicator blinks

Change with ADJ Key (e.g.from DOWN to UP)

Confi rms counting mode. 
Program Over. 
Timer starts working normally.

Cyclic OFF/ON {OFF Start, (Sym, Asym)}

 [

1

]

T-ON and T-OFF can be same or diff erent. The relay (R) keeps 
on changing its status till power is removed.

Cyclic ON/OFF{On Start,(Sym,Asym)}

 [

2

]

This function is quite similar to the function ‘1’ but initially 
the relay(R) is ON for period T-ON after the power is applied.

Impulse ON energizing

 [

3

]

After power ON, R energizes and timing starts. R de-ener-
gizes after timing is over.

Accumulative delay ON signal

 [

4

]

Time commences as supply is present and switch B1 is open. 
Closing switch  B1 pauses timing. Timing resumes when 
switch B1 is opened again. R energizes at the end of timing.

Accumulative delay ON inverted signal

 [

5

]

Time commences as supply is present and switch B1 is 
closed. Opening switch B1 pauses timing. Timing resumes 
when switch B1 is closed again. R energizes at end of timing.

Signal ON delay

 [

7

]

Permanent supply required. Timing starts when switch B1 is 
closed. R energizes at end of timing period and de-energiz-
es when B1 is opened.

Inverted signal ON delay

 [

8

]

Timing will commence when supply is present and switch 
B1 is open. R energizes after timing. If B1 is closed during 
timing period, timing resets to the beginning of cycle.

Signal OFF delay

 [

9

]

Permanent supply is required. R energizes when switch B1 
is closed. Timing commences after S is opened and then the 
relay de-energizes.

Impulse ON/OFF

 [

A

]

Permanent supply is required. R energizes for the timing pe-
riod when B1 is opened or closed. When timing commenc-
es, changing state of B1 does not aff ect R but resets timer.

Signal OFF/ON

 [

b

]

When switch B1 is closed or opened for preset time ,T, the 
relay changes its state after time duration T.

Leading edge impulse1

 [

C

]

A permanent supply is needed. When B1 is closed, output 
relay energizes until timing irrespective of any further ac-
tion of B1.

Leading edge impulse2

 [

d

]

Permanent supply is required. when switch B1 is closed, and 
remains closed output relay energizes until timing is over. If 
B1 is opened during timing, R resets.

Trailing edge impulse1

 [

E

]

Permanent supply required. when B1 is opened, R energizes
and de-energizes when timing is over. If B1 is closed during 
timing R resets.

Trailing edge impulse2

 [

F

]

Permanent supply is required. When switch B1 is opened, 
R energizes and will de-energize when timing is over. If B1 
is pulsed during timing period it will have no eff ect on R.

Delayed impulse

 [

G

]

When switch B1 is closed, T

OFF

 starts. Relay energizes at the 

end of T

OFF

 period. Then, T

OFF

  starts  irrespective  of  signal 

level and relay de-energizes at the end of T

ON

 period.

Accumulative impulse ON signal

 [

6

]

When supply is ON, R energizes. When switch B1 is closed 
timing is suspended and remains suspended till switch B1 is 
opened again. Interrupting supply resets timer.

Important Note:
1. Output de-energizes when device enters into PROGRAM MODE and starts new cycle after 

coming out of PROGRAM MODE.

2. Loads which have current requirement > 1mA, can only be used as  Optional Load. For e.g. 

Contactor Coil, AC Relay Coil, etc.

Reviews: