Elkay OBFAVRFRD Installation, Care & Use Manual Download Page 3

97571C (Rev. E - 11/04)

OBFAVRFRD

Page 3

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

HANGER BRACKETS AND TRAP INSTALLATION

1) Remove hanger bracket fastened to back of cooler by removing one screw.
2) Mount the hanger bracket and trap as shown in Figure 2.

NOTE:

  Hanger Bracket 

MUST

 be supported securely.  Add fixture support carrier if wall will not provide adequate support.

IMPORTANT:

y

7-3/4 in. (197mm) dimension from wall to centerline of trap must be maintained for proper fit.

y

Anchor hanger securely to wall using all six 1/4 in. dia. mounting holes.

3) Install straight valve for 3/8" O.D. tube.

INSTALLATION OF COOLER

4) Hang the cooler on the hanger bracket.  Be certain the hanger bracket is engaged properly in the slots on the cooler back.
5) Loosen the two screws holding the lower front panel at the bottom of cooler base.  Pull front panel forward to gain access
     inside cooler.
6) Connect water inlet line - See Note 4 of General Instructions.
7) Remove the slip nut and gasket from the trap and install them on the cooler water line making sure that the end of the
     waste line fits into the trap.  Assemble the slip nut and gasket to the trap and tighten securely.

START UP

Also See General Instructions

8) Stream height is factory set at 35 PSI.  If supply pressure varies greatly from this, adjust the screw on regulator item 15 by
     using a small screwdriver through the small hole in the push button item 2 (See Fig.3).  Clockwise adjustment will raise
     stream and counter-clockwise adjustment will lower stream.  For best adjustment stream should hit basin approximately
     6-1/2" (165mm) from bubbler.

PROTECT FROM HARD FREEZING

9) If the ambient air temperature drops below 0° F, the cooler needs to be drained of all water by blowing out all water lines
     and the drain trap.

FIG. 3

34

8

13

14

15

10

2

3

4

20

9

30

10

35

1

16

Reviews: