background image

OBFATLFR8*1E    OBFATLRFR8*1E

97786C (Rev. J - 4/05)

PAGE 3

HANGER BRACKETS & TRAP INSTALLATION

1) Remove hanger bracket fastened to back of cooler by removing one (1) screw.
2) Mount the hanger bracket and trap as shown in Figure 2.

NOTE:

 Hanger Bracket 

MUST

 be supported securely.  Add fixture support carrier if wall will not provide adequate support.

IMPORTANT:

• 7-3/4 in. (197mm) dimension from wall to centerline of trap must be maintained for proper fit.
• Anchor hanger securely to wall using all six (6) 1/4 in. dia. mounting holes.
3) Install straight valve for 3/8" O.D. tube.

INSTALLATION OF COOLER

4) Hang the cooler on the hanger bracket.  Be certain the hanger bracket is engaged properly in the slots on the cooler

back as shown in Figure 2.

5) Loosen the two (2) screws holding the lower front panel at the bottom of cooler base and two (2) screws at the top.

Remove the front panel and set aside.

6) Connect water inlet line--See Note 4 of General Instructions.
7) Remove the slip nut and gasket from the trap and install them on the cooler waste line making sure that the end of the

waste line fits into the trap.  Assemble the slip nut and gasket to the trap and tighten securely.

START UP

Also See General Instructions

8) Stream height is factory set at 35 PSI.  If supply pressure varies greatly from this, adjust the screw on regulator item 15

by using a small screwdriver through the small hole in the push button item 2 (See Fig.3).  CW adjustment will raise
stream and CCW adjustment will lower stream.  For best adjustment, stream should hit basin approximately 6-1/2”
(165mm) from bubbler.

5

9

12

14

15

16

1

4

10

11

6

7

3

2

10

FIG. 3

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

PROTECT FROM HARD FREEZING

 9) If the ambient air temperature drops below 0° F, the cooler needs to be drained of all water by blowing out all water
     lines, evaporator (item 53), and the drain trap.

18

Reviews: